|
|
q A CHECK INJECTION TIMING. pression stroke. 2. Remove injection tubes and air bleeder on the back of injection pump. 3. Set dial gauge so its indicator points to somewhere between 1.0 and 2.0 mm 4. Turn crankshaft two turns clockwise and check that dial gauge indicates the 5. Turn crankshaft counterclockwise about 100 degrees, then turn crankshaft 6. Turn crankshaft clockwise and set it at TDC using the mark on the crankshaft 7. Read plunger lift. Plunger lift: 0.36 ± 0.02 mm (0.0142 ± 0.0008 I When repeating the checking, start NG E OK Bleed air from fuel system. OK INSPECTION END Adjusting value, adjust by turning injection pump. I If indication is smaller than the I If indication is larger than the speci- 2. Tighten injection pump securing bolts and nuts. : 20 - 25 N ⋅ m (2.0 - 2.5 kg-m, 14 - 18 ft-lb) Bolt: : 32 - 42 N ⋅ m (3.3 - 4.3 kg-m, 24 - 31 ft-lb) 3. Remove dial gauge and install air bleeder with new washer. 4. Install injection tubes. Flare nut: : 20 - 25 N ⋅ m (2.0 - 2.5 kg-m, 14 - 18 ft-lb) 5. Bleed air from fuel system. E Go to . NEF468 NEF465 NEF466 EEF160A H H H TROUBLE DIAGNOSES TD27Ti Basic Inspection (Cont’d) EC-362 |