Mitsubishi Outlander (2003+). Manual - part 104

 

  Index      Mitsubishi     Mitsubishi Outlander - service repair manual 2003 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  102  103  104  105   ..

 

 

Mitsubishi Outlander (2003+). Manual - part 104

 

 

TROUBLESHOOTING

MULTIPORT FUEL INJECTION (MFI)

13A-279

STEP 20. Connector check: C-135 engine-ECU 
connector

Q: Is the check result normal?

YES : 

Check intermediate connectors C-105 and 

C-116, and repair if necessary. If 
intermediate connectors are normal, check 
and repair harness between A-02 (terminal 
No. 2) A/C pressure sensor connector and 
C-135 (terminal No. 42) engine-ECU 
connector.

œ

Check power line for open circuit and 
damage.

NO : 

Repair.

STEP 21. Connector check: C-135 engine-ECU 
connector

Q: Is the check result normal?

YES : 

Go to Step 8 .

NO : 

Repair.

AK300256

34 33 32

36 35

37

42

45

31

39

38

46

40

41

43

44

AB

CONNECTOR: C-135

C-135

Harness side connector

AK300340

1

2

3

Harness side
connector

A-02 (B)

AB

Connector: A-02

AK300256

34 33 32

36 35

37

42

45

31

39

38

46

40

41

43

44

AB

CONNECTOR: C-135

C-135

Harness side connector

TROUBLESHOOTING

MULTIPORT FUEL INJECTION (MFI)

13A-280

Inspection Procedure 30: Ignition Circuit System

3

4 5 6

1 2

1 2 3

1 2 3

1

14

4

19

5

22

6

17

8

15

9

18

7

20

16

2

13

12

23 24 25 26

21

3

10 11

AK300341

LOCK

ACC

IG1

R

IG2

ST

1

10A

Ignition coil 1

Engine-ECU

B-110

Ignition coil 2

B-111

2

1

1

3

3

2

10

23

1

Capacitor

B-107

16

26

Ignition switch

C-303

L-B

W

W

W

W

W

B-L

B

B

B

W-L

2

6

10

C-205

C-116

A-14

C-203

J/B

Ignition circuit

C-134

Wire colour code
B: Black  LG: Light green  G: Green  L: Blue  W: White  Y: Yellow  SB: Sky blue  BR: Brown  O: Orange  GR: Gray
R: Red  P: Pink  V:Violet

AB

Spark
plug

TROUBLESHOOTING

MULTIPORT FUEL INJECTION (MFI)

13A-281

OPERATION

œ

The battery voltage is applied to the ignition coil 
(terminal No. 1) from the ignition switch and is 
earthed to the vehicle body from the ignition coil 
(terminal No. 2).

œ

A power voltage of 12 V is applied to the ignition 
coil output terminal (terminal No. 3) from the 
engine-ECU (terminal No. 10 and No. 23).

FUNCTION

œ

When the engine-ECU makes the power transis-
tor in the unit be in "OFF" position, the battery 
voltage in the unit is applied to the power transis-
tor unit, and that makes the power transistor unit 
be in "ON" position. The engine-ECU makes the 
power transistor in the unit be in "ON", and that 
makes the power transistor unit be in "OFF" posi-
tion.

œ

In response to the signal from the engine-ECU, 
the power transistor unit is in "ON" position. The 
primary current is going to the ignition coil. When 
the power transistor unit is in "OFF" position, the 
primary current is interrupted and high voltage is 
generated in the secondary coil.

PROBABLE CAUSE

œ

Failed ignition coil

œ

Failed spark plug

œ

Failed spark plug cable

œ

Open/short circuit in ignition primary circuit or 
loose connector contact

œ

Failed engine-ECU

DIAGNOSIS PROCEDURE

STEP 1. Check spark plug cable itself.

œ

Check spark plug cable itself (Refer to GROUP 
16 

-

 Ignition System 

-

 On-vehicle Service 

3

16





).

Q: Is the check result normal?

YES : 

Go to Step 2 .

NO : 

Replace spark plug cable.

STEP 2. Check spark plug.

Q: Is the check result normal?

YES : 

Go to Step 3 .

NO : 

Replace spark plug.

STEP 3. Connector check: B-111 and B-110 
ignition coil connectors

Q: Is the check result normal? 

YES : 

Go to Step 4 .

NO : 

Repair.

STEP 4. Check ignition coil itself.

œ

Check ignition coil itself (Refer to GROUP 16 

-

 

Ignition System 

-

 On-vehicle Servic

3

16



).

Q: Is the check result normal? 

YES : 

Go to Step 5 .

NO : 

Replace ignition coil.

STEP 5. Measure voltage at B-111 and B-110 
ignition coil connectors.

œ

Disconnect connector, and measure at harness 
side.

œ

Ignition switch: ON 

œ

Voltage between terminal No. 1 and earth.

OK: System voltage

Q: Is the check result normal? 

YES : 

Go to Step 7 .

NO : 

Go to Step 6 .

AK300308

1

2

3

AB

Harness side 
connector

B-111 (GR)

B-110 (GR)

Connector: B-110, B-111

AK300308

1

2

3

AB

Harness side 
connector

B-111 (GR)

B-110 (GR)

Connector: B-110, B-111

TROUBLESHOOTING

MULTIPORT FUEL INJECTION (MFI)

13A-282

STEP 6. Connector check: C-303 ignition switch 
connector

Q: Is the check result normal? 

YES : 

Check intermediate connectors A-14, C-

203, C-205 and C-116, and repair if 
necessary. If intermediate connectors are 
normal, check and repair harness between 
C-303 (terminal No. 2) ignition switch 
connector and B-111 (terminal No. 1) 
ignition coil connector, also between C-303 
(terminal No. 2) ignition switch connector 
and B-110 (terminal No. 1) ignition coil 
connector.

œ

Check power supply line for 
open/short circuit.

NO : 

Repair.

STEP 7. Measure voltage at B-111 and B-110 
ignition coil connectors.

œ

Disconnect connector, and measure at harness 
side.

œ

Engine: Cranking

œ

Voltage between terminal No. 3 and earth.

OK: 0.5 

-

 4.0 V

Q: Is the check result normal? 

YES : 

Go to Step 13 .

NO : 

Go to Step 8 .

1

2

3

4

5

6

AK300304

CONNECTOR: C-303

C-303

Harness side
connector

AB

AK300308

1

2

3

AB

Harness side 
connector

B-111 (GR)

B-110 (GR)

Connector: B-110, B-111

AK300308

1

2

3

AB

Harness side 
connector

B-111 (GR)

B-110 (GR)

Connector: B-110, B-111

 

 

 

 

 

 

 

Content   ..  102  103  104  105   ..