|
|
CAMSHAFT TSB Revision ENGINE MECHANICAL 11A-25 CAMSHAFT REMOVAL AND INSTALLATION M1112007801084 Pre-removal operation Side Cover (RH) Removal (Refer to GROUP 51, Under Cover ). • Air Cleaner Assembly Removal (Refer to GROUP 15, Air Cleaner • Charge Air Cooler Intake Hose A, B and Charge Air Cooler Intake Pipe A Removal (Refer to GROUP 15, Charge Air Cooler ). • Strut Tower Bar Removal (Refer to GROUP 42A, Strut Tower Bar ). • Ignition Coil Removal (Refer to GROUP 16, Ignition Sys- tem − Ignition Coil ). Post-installation operation System − Ignition Coil • Strut Tower Bar Installation (Refer to GROUP 42A, Strut Tower Bar ). • Charge Air Cooler Intake Hose A, B and Charge Air Cooler Intake Pipe A Installation (Refer to GROUP 15, ). • Air Cleaner Assembly Installation (Refer to GROUP 15, Air Cleaner • Engine Room Under Cover Front A, B and Engine Room Side Cover (RH) Installation (Refer to GROUP 51, Under ). AC902500 1 23 17 16 13 9 20 6 2 AC 85 ± 5 N·m 7 19 3 31 30 22 11 14 15 24 25 26 29 28 5 34 25 ± 4 N·m 32 N 35 N 10 13 ± 1 N·m 12 21 4 33 8 N 18 27 N N Apply engine oil to all 10 ± 2 N·m 12 ± 1 N·m 17 ± 3 N·m 3.0 ± 1.0 N·m to 30 ± 2 N·m to 5.5 ± 0.5 N·m 12 ± 1 N·m 10 ± 2 N·m 10 ± 2 N·m 10 ± 2 N·m 10 ± 2 N·m (Engine oil) (Engine oil) |