Chrysler Crossfire. Manual - part 32

 

  Index      Chrysler     Chrysler Crossfire - service repair manual 2005 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  30  31  32  33   ..

 

 

Chrysler Crossfire. Manual - part 32

 

 

Note: The jaws of the crimping tool must be
closed completely for proper sealing.

13. Crimp the new C/V boot retaining clamp (3).

14. Install the half shaft to the vehicle. (Refer to 3 -

DIFFERENTIAL & DRIVELINE/HALF SHAFT -
INSTALLATION).

ZH

HALFSHAFTS

3 - 11

CV BOOT - OUTER

REMOVAL

1. Remove the halfshaft from the vehicle. (Refer to 3 -

DIFFERENTIAL &

DRIVELINE/HALF

SHAFT -

REMOVAL).

2. Remove the outer C/V boot retaining clamp (2)

from the axle halfshaft.

3. Remove the inner C/V boot retaining clamp (1)

from the C/V joint housing.

3 - 12

HALFSHAFTS

ZH

4. Clamp the axle halfshaft in a vise.

CAUTION: Insure to use a vise that is equipped
with protective caps on the jaws of the vise to pre-
vent any damage to the axle halfshaft.

5. Remove the C/V boot from the outer C/V joint

housing and slide it down the axle halfshaft.

6. Wipe away the grease to expose the outer C/V

joint and the halfshaft.

7. Using a soft–faced hammer sharply hit the end of

the C/V joint housing to dislodge the housing from
the internal circlip on the axle halfshaft.

8. Slide the outer C/V joint off the end of the halfshaft.

9. Slide the C/V boot off of the axle halfshaft.

10. Thoroughly clean and inspect the outer C/V joint

assembly for any signs of excessive wear.

ZH

HALFSHAFTS

3 - 13

INSTALLATION

1. Clean and inspect the C/V joint for wear and pit-

ting. Replace as required. (Refer to 3 - DIFFEREN-
TIAL & DRIVELINE/HALF SHAFT/C/V JOINT -
INSPECTION).

2. Remove any road grime and debris from the axle

shaft splines.

3. Before installing the C/V boot, cover the shaft

splines to protect the C/V boot during installation.

4. Slide the new C/V boot onto the axle halfshaft.

3 - 14

HALFSHAFTS

ZH

 

 

 

 

 

 

 

Content   ..  30  31  32  33   ..