|
|
4 - 50 ENG PRIMARY AND SECONDARY SHEAVES INSTALLING THE PRIMARY AND 1.Install: ● Secondary sheave assembly ● V-belt ● Primary sheave assembly NOTE: ● Tightening the bolts 1 will push the secondary sliding sheave away, causing the ● Install the V-belt so that its arrow faces the 2.Tighten: ● Nut (primary sheave) 1
● Nut (secondary sheave) 2
NOTE: ● Use the sheave holder 3 to hold the primary sheave. ● First, tighten the nut (primary sheave) 1 , then tighten the nut (secondary sheave) 2 . Sheave holder: P/N. YU-01880, 90890-01701 T
R . . 100 Nm (10.0 m • kg, 72 ft • lb) T
R . . 100 Nm (10.0 m • kg, 72 ft • lb) |