|
|
ENGINE - V8 OVERHAUL 12-2-57 Reassembly 1. Clean timing gear cover and mating face. and dry, remove all traces of sealant from 4. Fit a new timing gear cover gasket, dry, to timing cover locating dowels. 5. Locate tool LRT-12-090. on timing cover and oil pump drive gear. 6. Position timing cover to cylinder block and at the same time rotate tool LRT-12-090. until 7. Remove tool LRT-12-090.. threads of timing cover bolts. 9. Align 2 camshaft sensor harness clips to timing gear cover bolt holes. Noting positions of the 10. Apply smear of Retinax LX grease to oil seal running surface on crankshaft. CAUTION: Replacement oil seal is pre- 11. Fit seal to timing gear cover using tool LRT-12- 089. 12. Clean and fit crankshaft pulley. (200 lbf.ft). 14. Remove tool LRT-12-080 from crankshaft pulley. 15. Clean oil filter mating face. and fit filter. 17. Ensure coolant pump and pulley mating faces are clean. 18. Remove all traces of thread locking material from coolant pump pulley drive flange bolt 19. Fit coolant pump pulley and tighten new Patchlok bolts to 22 Nm (16 lbf.ft). 20. Fit oil pick up strainer. |