|
|
CHG DIAGNOSIS AND REPAIR WORK FLOW CHG-19 < BASIC INSPECTION > C D E F G H I J K L B A O P N >> GO TO 2. 2. STOP POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM Stop the operation of the power generation voltage variable control in either of the following procedures. DUTY” to 0 % by selecting “ALTERNATOR DUTY” of “Active Test”. Continue “Active Test” until the end of • Turn the ignition switch OFF, and disconnect the battery current sensor connector. [However, DTC (P1550 - P1554) of the engine might remain. After finishing the inspection, connect the battery current sensor connec- >> GO TO 3. 3. INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS TURNED ON) When ignition switch is turned ON YES >> GO TO 4. NO >> GO TO 10. 4. INSPECTION WITH CHARGE WARNING LAMP (IDLING) Start the engine and run it at idle. Does the charge warning lamp turn OFF? YES >> GO TO 5. NO >> GO TO 6. 5. INSPECTION WITH CHARGE WARNING LAMP (ENGINE AT 2,500 RPM) Increase and maintain the engine speed at 2,500 rpm. Does the charge warning lamp illuminate? YES >> GO TO 8. NO >> INSPECTION END 6. “L” TERMINAL CIRCUIT (SHORT) INSPECTION Check “L” terminal circuit (short). Refer to Is the inspection result normal? YES >> GO TO 7. NO >> Repair as needed. 7. “S” TERMINAL CIRCUIT INSPECTION Check “S” terminal circuit. Refer to Is the inspection result normal? YES >> GO TO 8. NO >> Repair as needed. 8. MEASURE “B” TERMINAL VOLTAGE Start engine. With engine running at 2,500 rpm, measure “B” terminal voltage. What voltage does the measurement result show? Less than 13.0 V>>GO TO 9. CHG-31, "Removal and Installation" 9. “B” TERMINAL CIRCUIT INSPECTION Check “B” terminal circuit. Refer to Is the inspection result normal? YES >> Replace alternator. Refer to CHG-31, "Removal and Installation" NO >> Repair as needed. 10. INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS ON) |