|
|
Content .. 1071 1072 1073 1074 ..
DOOR TSB Revision BODY 42A-95 STEP 5. Check the fusible link (34) line of power supply voltage available at the wiring harness side of the (2) Measure the voltage between terminal 1 and ground. • The voltage should measure approximately 12 volts (battery positive voltage). Q: Is the measured voltage approximately 12 volts (battery positive voltage)? STEP 6. Check the wiring harness between ETACS-ECU • Check the power supply line for open circuit and short cir- cuit. Q: Is the wiring harness between ETACS-ECU connector C-309 (terminal 1) and fusible link (34) in good connector(s) may have loose, corroded or damaged STEP 7. Check ETACS-ECU connector C-307 for loose, YES : Go to Step 8. to GROUP 00E, Harness Connector Inspection . Verify that the power window works normally. AC702474 Connector C-309 AD (harness side) |