|
|
TROUBLESHOOTING MULTIPOINT FUEL INJECTION (MPI) 13A-129 DIAGNOSIS PROCEDURE STEP 1. Check battery. • Check battery (Refer to GROUP 54A − Battery − On-vehicle Service − Battery Test ). Q: Is the check result normal? YES : Go to Step 2. NO : Replace the battery. STEP 2. M.U.T.-III data list • Item 79: Cranking signal OK: ON (ignition switch: "ST") Q: Is the check result normal? YES : Go to Step 15. NO : Go to Step 3. STEP 3. Connector check: engine-ECU Q: Is the check result normal? YES : Go to Step 4. NO : Repair or replace the connector. STEP 4. Perform voltage measurement at • Disconnect connector, and measure at harness side. • Ignition switch: "ST" • Voltage between terminal STOE and body earth. OK: System voltage Q: Is the check result normal? YES : Go to Step 10 <Vehicles without KOS>. YES : Go to Step 11 <Vehicles with KOS>. NO : Go to Step 5. STEP 5. Connector check: ETACS-ECU Q: Are the check results normal? YES : Go to Step 6. NO : Repair or replace the connector. STEP 6. Perform voltage measurement at • Disconnect connector, and measure at harness side. • Ignition switch: "ST" • Voltage between terminal STOE and body earth. OK: System voltage Q: Is the check result normal? YES : Go to Step 9. NO : Go to Step 7 <Vehicles without KOS>. NO : Go to Step 8 <Vehicles with KOS>. STEP 7. Check ignition switch itself. • Ignition switch connector check. • Check ignition switch itself (Refer to GROUP 54A − Ignition Switch − Inspection − Ignition Switch Q: Is the check result normal? YES : Repair or replace the connector, or check and repair the harness between ignition • Check power supply line for open/short circuit. NO : Replace the ignition switch. STEP 8. Check harness between OSS-ECU • Check power supply line for open/short circuit. Q: Is the check result normal? YES : Perform troubleshooting of OSS System (Refer to GROUP 42B − Troubleshooting − Trouble Symptom Chart ). NO : Repair or replace the connector, or repair STEP 9. Continuity check on ETACS-ECU • Disconnect connectors, and measure at ETACS-ECU side. • Continuity check between terminal ST and STOE. OK: Continuity Q: Is the check result normal? YES : Check and repair the harness between ETACS-ECU connector terminal STOE and • Check power supply line for open/short circuit. NO : Replace the ETACS-ECU. |