|
|
Content .. 1292 1293 1294 1295 ..
INSTALLATION 1. Install the run channel and quarter glass assembly through the window opening and into the door 2. Install the front (1), rear bolts and tighten to 9 N·m (80 in. lbs.). 3. Install the door glass (1). (Refer to 23 - BODY/ DOORS - REAR/DOOR GLASS - INSTALLATION) 4. Install the outer belt molding (1). (Refer to 23 - BODY/WEATHERSTRIP/SEALS/REAR DOOR OUTER BELT MOLDING - INSTALLATION) 23 - 76 DOORS - REAR KJ |