Dodge Neon / Neon SRT-4. Manual - part 574

 

  Index      Dodge     Dodge Neon / Neon SRT-4 - service repair manual 2005 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  572  573  574  575   ..

 

 

Dodge Neon / Neon SRT-4. Manual - part 574

 

 

TEST

ACTION

APPLICABILITY

7

NOTE: Before continuing, check the PCM harness connector terminals for
corrosion, damage, or terminal push out. Repair as necessary.
If there are no possible causes remaining, view repair.

All

Repair

Replace and program the Powertrain Control Module in accor-
dance with the Service Information.
Perform POWERTRAIN VERIFICATION TEST VER - 5.

201

DRIVEABILITY - NGC

P0508-IAC VALVE SENSE CIRCUIT LOW —

Continued

Symptom:

P0509-IAC VALVE SENSE CIRCUIT HIGH

When Monitored and Set Condition:

P0509-IAC VALVE SENSE CIRCUIT HIGH

When Monitored:

Engine running. Battery voltage greater than 10 volts.

Set Condition:

The IAC sense circuit is greater than 980 mA. One Trip Fault.

POSSIBLE CAUSES

IAC MOTOR OPERATION

IAC MOTOR

(K961) IAC RETURN CIRCUIT SHORTED TO VOLTAGE

(K610) IAC MOTOR CONTROL CIRCUIT SHORTED TO VOLTAGE

(K961) IAC RETURN CIRCUIT SHORTED TO (K610) IAC MOTOR CONTROL CIRCUIT

PCM

TEST

ACTION

APPLICABILITY

1

NOTE: If the engine will not idle, maintain an engine speed between 800 and
1500 RPM.
Start the engine.
Allow the engine to idle.
With the DRBIII

t, read the IAC Current.

Is the IAC Current above 999 mA?

All

Yes

→ Go To 2

No

→ Refer to the INTERMITTENT CONDITION symptom in the

Driveability category.
Perform POWERTRAIN VERIFICATION TEST VER - 5.

2

Turn the ignition off.
Disconnect the IAC Motor harness connector.
With the DRBIII

t, monitor the IAC Current.

Turn the ignition on.
Does the DRBIII

t display IAC Current at 0mA?

All

Yes

→ Replace the IAC Motor.

Perform POWERTRAIN VERIFICATION TEST VER - 5.

No

→ Go To 3

202

DRIVEABILITY - NGC

TEST

ACTION

APPLICABILITY

3

Turn the ignition off.
Disconnect the IAC Motor harness connector.
Turn the ignition on.
With the DRBIII

t, actuate the ASD Relay.

Measure the voltage of the (K961) IAC Return circuit in the IAC Motor harness
connector.
Is the voltage above 0.5 of a volt?

All

Yes

→ Repair the short to voltage in the (K961) IAC Return circuit.

Perform POWERTRAIN VERIFICATION TEST VER - 5.

No

→ Go To 4

4

Turn the ignition off.
Disconnect the IAC Motor harness connector.
Turn the ignition on.
With the DRBIII

t, actuate the ASD Relay.

Measure the voltage of the (K610) IAC Motor Driver circuit in the IAC Motor harness
connector.
Is the voltage above 0.5 of a volt?

All

Yes

→ Repair the short to voltage in the (K610) IAC Motor Control

circuit.
Perform POWERTRAIN VERIFICATION TEST VER - 5.

No

→ Go To 5

5

Turn the ignition off.
Disconnect the IAC Motor harness connector.
Measure the resistance across the IAC Motor harness connector.
Is the resistance below 5.0 ohms?

All

Yes

→ Repair the (K961) IAC Motor Return circuit short to the (K610)

IAC Motor Control circuit.
Perform POWERTRAIN VERIFICATION TEST VER - 5.

No

→ Go To 6

6

NOTE: Before continuing, check the PCM harness connector terminals for
corrosion, damage, or terminal push out. Repair as necessary.
If there are no possible causes remaining, view repair.

All

Repair

Replace and program the Powertrain Control Module in accor-
dance with the Service Information.
Perform POWERTRAIN VERIFICATION TEST VER - 5.

203

DRIVEABILITY - NGC

P0509-IAC VALVE SENSE CIRCUIT HIGH —

Continued

Symptom:

P0513-INVALID SKIM KEY

When Monitored and Set Condition:

P0513-INVALID SKIM KEY

When Monitored:

Ignition on.

Set Condition:

The PCM detects an invalid SKIM key.

POSSIBLE CAUSES

INCORRECT VIN IN PCM

INVALID SKIM KEY NOT PRESENT

NO COMMUNICATION WITH SKIM

NO VIN PROGRAMMED IN THE PCM

PCM

SKIM TROUBLE CODES SET

TEST

ACTION

APPLICABILITY

1

Turn the ignition on.
With the DRBIII

t, read the PCM DTCs.

Is the Good Trip Counter displayed and equal to zero?

All

Yes

→ Go To 2

No

→ Go To 7

2

With the DRBIII

t, attempt to communicate with the SKIM.

Turn the ignition on.
Can the DRBIII

t communicate with the SKIM?

All

Yes

→ Go To 3

No

→ Refer to the No Communication category.

Perform SKIS VERIFICATION.

3

Turn the ignition on.
With the DRBIII

t, check for SKIM DTCs.

Are any DTCs present in the SKIM?

All

Yes

→ Refer to SKIM category for the related symptom(s).

Perform SKIS VERIFICATION.

No

→ Go To 4

4

Turn the ignition on.
With the DRBIII

t, display the VIN that is programmed in the PCM.

Has a VIN been programmed into the PCM?

All

Yes

→ Go To 5

No

→ Program the correct VIN into the PCM and retest.

Perform SKIS VERIFICATION.

204

DRIVEABILITY - NGC

 

 

 

 

 

 

 

Content   ..  572  573  574  575   ..