|
|
Content .. 1089 1090 1091 1092 ..
7. Install timing chain tensioner (1) and torque bolts to 12 N·m (105 in. lbs.). NOTE: Keep the slack in the timing chain on the 8. Install the moveable timing chain pivot guide (6) and torque bolt to 12 N·m (105 in. lbs.). 9. Remove timing tensioner pin 8514 (2). 10. Rotate the crankshaft CLOCKWISE two complete revolutions until the crankshaft is repositioned at 11. Install front timing chain cover (Refer to 9 - ENGINE/VALVE TIMING/TIMING BELT / CHAIN 12. Connect negative battery cable. 13. Fill with oil, start engine and check for leaks. PM ENGINE 2.0L WORLD 9 - 1651 |