Chevrolet Silverado / GMC Sierra. Manual - part 1347

 

  Index      Chevrolet     Chevrolet Silverado / GMC Sierra - service repair manual 2007-2009 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  1345  1346  1347  1348   ..

 

 

Chevrolet Silverado / GMC Sierra. Manual - part 1347

 

 

Fig. 96: Remove Upper Differential Carrier Assembly Bushing Using J 36616-2, J 
33791-1, Thrust Bearing, J 21474-18 & Forcing Screw
 
Courtesy of GENERAL MOTORS CORP. 

2. Remove the upper differential carrier assembly bushing by performing the following steps: 

1. Install the J 36616-2 (1), the J 33791-1 (2), the thrust bearing (3), the J 21474-18 (4), 

and the forcing screw as shown.  

2. Remove the upper differential carrier assembly bushing by holding the forcing screw 

and slowly tightening the J 21474-18.  

 

2008 Chevrolet Silverado 1500 

2008 Driveline/Axle Front Drive Axle - Cab & Chassis Sierra, Cab & Chassis Silverado, Sierra & Silverado

  

Fig. 97: Removing Lower Differential Carrier Assembly Bushingj 21474-18, Thrust 
Bearing, J 33791-1, J 36616-2, & Forcing Screw
 
Courtesy of GENERAL MOTORS CORP. 

3. Remove the lower differential carrier assembly bushing by performing the following steps: 

1. Install the J 21474-18 (1), the thrust bearing (2), the J 33791-1 (3), the J 36616-2 (4), 

and the forcing screw as shown.  

2. Remove the lower differential carrier assembly bushing by holding the forcing screw 

and slowly tightening the J 21474-18.  

Installation Procedure 

 

2008 Chevrolet Silverado 1500 

2008 Driveline/Axle Front Drive Axle - Cab & Chassis Sierra, Cab & Chassis Silverado, Sierra & Silverado

  

Fig. 98: Installing Lower Differential Carrier Assembly Bushing Using J 21474-18, 
Thrust Bearing, J 36616-2, J 36616-1, & Forcing Screw
 
Courtesy of GENERAL MOTORS CORP. 

1. Install the lower differential carrier assembly bushing by performing the following steps: 

1. Install the J 21474-18 (1), the thrust bearing (2), the J 36616-2 (3), the J 36616-1 (4), 

and the forcing screw (5) as shown.  

2. While holding the forcing screw, slowly tighten the J 21474-18 until the bushing has 

stopped against the step on the bushing and is centered within the differential carrier 
assembly bushing bore.  

 

2008 Chevrolet Silverado 1500 

2008 Driveline/Axle Front Drive Axle - Cab & Chassis Sierra, Cab & Chassis Silverado, Sierra & Silverado

  

Fig. 99: Installing Upper Differential Carrier Assembly Bushing J 21474-18, Thrust 
Bearing, J 36616-2, J 36616-1, & Forcing Screw
 
Courtesy of GENERAL MOTORS CORP. 

2. Install the upper differential carrier assembly bushing by performing the following steps: 

1. Install the J 21474-18 (1), the thrust bearing (2), the J 36616-2 (3), the J 36616-1 (4), 

and the forcing screw (5) as shown.  

2. While holding the forcing screw, slowly tighten the J 21474-18 until the bushing has 

stopped against the step on the bushing and is centered within the differential carrier 
assembly bushing bore.  

3. Install the differential carrier assembly. Refer to Differential Carrier Assembly 

Replacement (1500 FWD) or Differential Carrier Assembly Replacement (2500 

 

2008 Chevrolet Silverado 1500 

2008 Driveline/Axle Front Drive Axle - Cab & Chassis Sierra, Cab & Chassis Silverado, Sierra & Silverado

  

 

 

 

 

 

 

 

Content   ..  1345  1346  1347  1348   ..