|
|
Fig. 67: Upper Intake Manifold 14. Install the intake manifold - upper. 15. If reusing the old throttle body/intake manifold studs, apply threadlock to the threads. Refer to Sealers, Adhesives, and Lubricants for the correct part number. 16. Install the front two throttle body studs.
2008 Chevrolet Silverado 1500 2008 ENGINE Engine Mechanical - 4.3L - Sierra & Silverado
17. Install the intake manifold - upper studs. Tighten: Tighten the studs to 9 N.m (80 lb in). 18. Connect the power brake booster vacuum hose to the vacuum fitting. Fig. 68: Locating PCV Valve Hose At Valve & Rocker Cover 19. Install the PCV valve hose to the valve cover and rocker cover.
2008 Chevrolet Silverado 1500 2008 ENGINE Engine Mechanical - 4.3L - Sierra & Silverado
Fig. 69: Engine Wiring Harness Bracket Stud 20. Position the engine wiring harness and bracket. 21. Install the engine wiring harness bracket stud (1). Tighten: Tighten the stud to 25 N.m (18 lb ft). 22. Install the engine wiring harness rear bracket nut at the EVAP canister purge solenoid valve. Tighten: Tighten the nut to 9 N.m (80 lb in).
2008 Chevrolet Silverado 1500 2008 ENGINE Engine Mechanical - 4.3L - Sierra & Silverado
Fig. 70: Engine Wiring Harness Ground Nut 23. Install the engine wiring harness ground nut and ground wire (1) to the rear of the right cylinder head. Tighten: Tighten the nut to 16 N.m (12 lb ft).
2008 Chevrolet Silverado 1500 2008 ENGINE Engine Mechanical - 4.3L - Sierra & Silverado
|
|
|