Jeep Grand Cherokee WK. Manual - part 1228

 

  Index      Jeep     Jeep Grand Cherokee WK - service repair manual 2005 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  1226  1227  1228  1229   ..

 

 

Jeep Grand Cherokee WK. Manual - part 1228

 

 

9. Identify rod bearing caps before removal. Remove rod bearing caps with bearings.

10. Identify main bearing caps (1) before removal.

11. Remove main bearing caps (1) and bearings one

at a time.

9 - 1508

ENGINE - 5.7L SERVICE INFORMATION

WK

12. Remove the thrust washers.

13. Remove the crankshaft out of the block.

INSTALLATION

WK

ENGINE - 5.7L SERVICE INFORMATION

9 - 1509

1. Select the proper main bearings (Refer to 9 -

ENGINE/ENGINE

BLOCK/CRANKSHAFT

MAIN

BEARINGS - STANDARD PROCEDURE).

2. Install main bearings in block and caps, and lubri-

cate bearings.

3. Position the crankshaft into the cylinder block.

4. Install the thrust washers (1).

9 - 1510

ENGINE - 5.7L SERVICE INFORMATION

WK

NOTE: The main cap crossbolts are torqued after final torque of the main cap bolts. Always use a new
washer/seal on crossbolts.

5. Clean and oil all cap bolts. Install all main bearing caps (1). Install all cap bolts and alternately tighten in two

steps using the following sequence.

6.

Step 1 – 27 N·m ( 20ft. lbs.) torque.

7.

Step 2 – Turn main cap bolts an additional 90°.

8. Install the crossbolts with new washer/gasket.

Starting with crossbolt A torque each crossbolt to
28 N·m ( 21ft. lbs.)torque.

9. Repeat crossbolt torque procedure.

10. Measure crankshaft end play (Refer to 9 -

ENGINE/ENGINE BLOCK/CRANKSHAFT MAIN

WK

ENGINE - 5.7L SERVICE INFORMATION

9 - 1511

 

 

 

 

 

 

 

Content   ..  1226  1227  1228  1229   ..