Isuzu KB P190. Manual - part 56

 

  Index      Isuzu     Isuzu KB P190 - service repair manual 2007 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  54  55  56  57   ..

 

 

Isuzu KB P190. Manual - part 56

 

 

SHEET METAL  2B-27 

 

 
 
 
 

 
 
 

Important Operations – Installation 

Bolt : A 

Torque N

⋅m(kgf⋅m/lb⋅ft)

50 (5.1 / 37) 

 

Bolt : B,C 

Torque N

⋅m(kgf⋅m/lb⋅ft)

72 (7.3 / 53) 

 

Bolt : D,E,H,I 

Torque N

⋅m(kgf⋅m/lb⋅ft)

54 (5.5 / 40) 

 

NOTE :  

Discard the used mounting bolts D,E,H,I shown in the 
figure and install new ones. 

 

 

2B-28  SHEET METAL 

EXTEND CAB Model 

 

 
 
 
 

 

 

RTW72BXF000201 

SHEET METAL  2B-29 

 

 
 
 
 

 
 
 

Important Operations – Installation 

Bolt : A 

Torque N

⋅m(kgf⋅m/lb⋅ft)

50 (5.1 / 37) 

 

Bolt : B,C 

Torque N

⋅m(kgf⋅m/lb⋅ft)

72 (7.3 / 53) 

 

Bolt : D,G,H 

Torque N

⋅m(kgf⋅m/lb⋅ft)

54 (5.5 / 40) 

 

NOTE :  

Discard the used mounting bolts D,G,H shown in the 
figure and install new ones. 

 

 

2B-30  SHEET METAL 

CREW CAB Model 

 

 
 
 
 

 

 

RTW72BXF000301 

 

 

 

 

 

 

 

Content   ..  54  55  56  57   ..