|
|
BRC-50 < COMPONENT DIAGNOSIS > [VDC/TCS/ABS] C1120, C1122, C1124, C1126 IN ABS SOL Is the inspection result normal? YES >> GO TO 3. NO >> Repair or replace malfunctioning components. 3. CHECK SOLENOID, VDC SWITCH-OVER VALVE AND ACUATOR RELAY GROUND CIRCUIT Check continuity between ABS actuator and electric unit (control unit) harness connector terminals and Is the inspection result normal? YES >> Replace ABS actuator and electric unit (control unit). NO >> Repair or replace malfunctioning components. Component Inspection INFOID:0000000001635080 1. CHECK ACTIVE TEST 1. Select each test menu item on ”ACTIVE TEST“. 2. On the display, touch “Up”, “Keep”, and “Down”, and check that the system operates as shown in the table *: On for 1 to 2 seconds after the touch, and then Off. NOTE: A brief moment of On/Off condition occurs every 20 seconds after ignition switch turned ON. This is not malfunction because it is Is the inspection result normal? YES >> INSPECTION END ABS actuator and electric unit (control unit) — Voltage Connector Terminal E41 3 Ground Battery voltage ABS actuator and electric unit (control unit) — Continuity Connector Terminal E41 1, 4 Ground Existed Test item Display item (Note) Display Up Keep Down FR RH SOL FR RH IN SOL Off On On FR RH OUT SOL Off Off On* USV [FR-RL] Off Off Off HSV [FR-RL] Off Off Off FR LH SOL FR LH IN SOL Off On On FR LH OUT SOL Off Off On* USV [FL-RR] Off Off Off HSV [FL-RR] Off Off Off RR RH SOL RR RH IN SOL Off On On RR RH OUT SOL Off Off On* USV [FL-RR] Off Off Off HSV [FL-RR] Off Off Off RR LH SOL RR LH IN SOL Off On On RR LH OUT SOL Off Off On* USV [FR-RL] Off Off Off HSV [FR-RL] Off Off Off |