|
|
Fig. 147: Measuring Resistance Between PCM Connector Terminals C4 And A9 Is there 12-25 ohms? YES -Go to step 23. NO -Go to step 12. 12. Disconnect the shift solenoid harness connector at the transmission housing. 13. Check for continuity between PCM connector terminal C4 and shift solenoid harness connector terminal No. 2. Fig. 148: Checking Continuity Between PCM Connector Terminal C4 And Shift Solenoid Harness Is there continuity? YES -Go to step 14. NO -Repair open in the wire between PCM connector terminal C4 and the shift solenoid harness 14. Remove the shift solenoid harness (see SHIFT SOLENOID VALVE TEST ).
2007 Honda Element EX 2007-2008 TRANSMISSION Automatic Transmission - Element
|