Dodge Dakota (R1). Manual - part 33

 

  Index      Dodge     Dodge Dakota (R1) - service repair manual 2000 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  31  32  33  34   ..

 

 

Dodge Dakota (R1). Manual - part 33

 

 

TEST

ACTION

APPLICABILITY

8

Note: Ensure there is PCI Bus communication with other modules on the
vehicle before proceeding. If not, refer to the symptom list from the menu
and repair as necessary.
Disconnect the A/C Heater Control C1 harness connector.
Use Scope input cable CH7058, Cable to Probe adapter CH7062, and the red and
black test probes.
Connect the scope input cable to the channel one connector on the DRB. Attach the
red and black leads and the cable to probe adapter to the scope input cable.
With the DRBIII

t select Pep Module Tools.

Select lab scope.
Select Live Data.
Select 12 volt square wave.
Press F2 for Scope.
Press F2 and use the down arrow to set voltage range to 20 volts. Press F2 again
when complete.
Connect the Black lead to the chassis ground. Connect the Red lead to the PCI Bus
circuit in the A/C Heater Control connector.
Turn the ignition on.
Observe the voltage display on the DRB Lab Scope.
Does the voltage pulse from 0 to approximately 7.5 volts?

All

Yes

Go To

9

No

Repair the PCI Bus circuit for an open.
Perform BODY VERIFICATION TEST - VER 1.

9

If there are no possible causes remaining, view repair.

All

Repair

Replace the A/C Heater Control.
Perform BODY VERIFICATION TEST - VER 1.

129

COMMUNICATION

*BUS +/- SIGNALS OPEN OR NO RESPONSE FROM HVAC —

Continued

Symptom:

*BUS +/- SIGNALS OPEN OR NO RESPONSE FROM INSTRUMENT
CLUSTER

POSSIBLE CAUSES

ATTEMPT TO COMMUNICATE WITH THE BCM

OPEN GROUND CIRCUIT(S)

OPEN FUSED IGNITION SWITCH OUTPUT CIRCUITS

OPEN FUSED B+ CIRCUIT

OPEN PCI BUS CIRCUIT

INSTRUMENT CLUSTER

TEST

ACTION

APPLICABILITY

1

Turn the ignition on.
With the DRB, enter Body then Body Computer.
Was the DRB able to I/D or communicate with the CTM?

All

Yes

Go To

2

No

Refer to the symptom list for problems related to no communica-
tion with the BCM.
Perform BODY VERIFICATION TEST - VER 1.

2

Turn the ignition off.
Turn all lights off.
Disconnect the Instrument Cluster C1 harness connector.
Measure the resistance between ground and both ground circuits.
Is the resistance below 10.0 ohms for both measurements?

All

Yes

Go To

3

No

Repair the ground circuit(s) for an open.
Perform BODY VERIFICATION TEST - VER 1.

3

Turn the ignition off.
Disconnect the Instrument Cluster C1 harness connector.
Turn the ignition on.
Using a 12-volt test light connected to ground, probe both Fused Ignition Switch
Output circuits.
Is the test light illuminated for both circuits?

All

Yes

Go To

4

No

Check Fuse #8 or Fuse #14 in the Junction Block for an open. If
ok repair the Fused Ignition Switch Output circuit for an open.
Perform BODY VERIFICATION TEST - VER 1.

4

Turn the ignition off.
Disconnect the Instrument Cluster C1 harness connector.
Using a 12-volt test light connected to ground, probe the Fused B+ circuit.
Is the test light illuminated?

All

Yes

Go To

5

No

Repair the Fused B+ circuit for an open.
Perform BODY VERIFICATION TEST - VER 1.

130

COMMUNICATION

TEST

ACTION

APPLICABILITY

5

Note: Ensure there is PCI Bus communication with other modules on the
vehicle before proceeding. If not, refer to the symptom list from the menu
and repair as necessary.
Disconnect the Instrument Cluster C1 harness connector.
Use Scope input cable CH7058, Cable to Probe adapter CH7062, and the red and
black test probes.
Connect the scope input cable to the channel one connector on the DRB. Attach the
red and black leads and the cable to probe adapter to the scope input cable.
With the DRBIII

t select Pep Module Tools.

Select lab scope.
Select Live Data.
Select 12 volt square wave.
Press F2 for Scope.
Press F2 and use the down arrow to set voltage range to 20 volts. Press F2 again
when complete.
Connect the Black lead to the chassis ground. Connect the Red lead to the PCI Bus
circuit in the Instrument Cluster connector.
Turn the ignition on.
Observe the voltage display on the DRB Lab Scope.
Does the voltage pulse from 0 to approximately 7.5 volts?

All

Yes

Go To

6

No

Repair the PCI Bus circuit for an open.
Perform BODY VERIFICATION TEST - VER 1.

6

If there are no possible causes remaining, view repair.

All

Repair

Replace the Instrument Cluster.
Perform BODY VERIFICATION TEST - VER 1.

131

COMMUNICATION

*BUS +/- SIGNALS OPEN OR NO RESPONSE FROM INSTRUMENT CLUS-
TER —

Continued

Symptom:

*BUS +/- SIGNALS OPEN OR NO RESPONSE FROM SENTRY KEY
IMMOBILIZER MODULE

POSSIBLE CAUSES

ATTEMPT TO COMMUNICATE WITH THE CTM

GROUND CIRCUIT OPEN

FUSED IGNITION SWITCH OUTPUT CIRCUIT OPEN

FUSED B(+) CIRCUIT OPEN

OPEN PCI BUS CIRCUIT

SENTRY KEY IMMOBILIZER MODULE

TEST

ACTION

APPLICABILITY

1

Turn the ignition on.
With the DRB, enter Body then Body Computer.
Was the DRB able to I/D or communicate with the CTM?

All

Yes

Go To

2

No

Refer to the symptom list for problems related to no communica-
tion with the CTM.
Perform SKIS VERIFICATION.

2

Turn the ignition off.
Disconnect the SKIM harness connector.
Measure the resistance between ground and the ground circuit.
Is the resistance below 5.0 ohms?

All

Yes

Go To

3

No

Repair the ground circuit for an open.
Perform SKIS VERIFICATION.

3

Turn the ignition off.
Disconnect the SKIM harness connector.
Turn the ignition on.
Using a 12-volt test light connected to ground, probe the Fused Ignition Switch
Output circuit.
Is the test light illuminated?

All

Yes

Go To

4

No

Repair the Fused Ignition Switch Output circuit for an open.
Perform SKIS VERIFICATION.

4

Turn the ignition off.
Disconnect the SKIM harness connector.
Using a 12-volt test light connected to ground, probe the Fused B(+) circuit.
Is the test light illuminated?

All

Yes

Go To

5

No

Repair the Fused B+ circuit for an open.
Perform SKIS VERIFICATION.

132

COMMUNICATION

 

 

 

 

 

 

 

Content   ..  31  32  33  34   ..