Chery Amulet Engine. Manual - part 1

 

  Index      Chery     Chery Amulet Engine - manual

 

Search                

 

 

 

 

 

 

 

 

 

Content   ..  1  2  3   ..

 

 

Chery Amulet Engine. Manual - part 1

 

 

1.6 Liter Gas engine Service recommendations



 EnginE Oil REcOmmEndatiOns

The  unit  has  been  filled  with  “break  in”  engine  oil  
at  the  factory.  Use  a  high-quality  detergent  oil  clas-
sified “For Service CC, SD, SE or SF.” Detergent oils 
keep the engine cleaner and reduce carbon deposits. 
Use  oil  having  the  following  SAE  viscosity  rating, 
based on the ambient temperature range anticipated 
before the next oil change:

temperature

oil Grade (recommended)

above 75º F (24º c)

sae 30W

40º to 75º F (4.4º to 24º c)

sae 20W or 15W-40

10º to 40º F (-12º to 4.4º c)

sae 10W or 15W-40

Below 10º F (-12º c)

sae 5W-30 (synthetic) or 5W-20

Crankcase Oil Capacity .......0.875 U.S. Gallons (w/filter)

cOOlant

Use a mixture of half low silicate, ethylene glycol base 
antifreeze and half soft water. Use only soft water and 
only low silicate antifreeze. If desired, you may add a 
high quality rust inhibitor to the recommended cool-
ant  mixture.  When  adding  coolant,  always  add  the 
recommended 50-50 mixture.

Coolant Capacity ...................................5 U.S. gallons

*

  do not remove the radiator pressure cap while 

the engine is hot or serious burns from boiling 

liquid or steam could result.

dangER

*

  ethylene glycol base antifreeze is poisonous. 

do not use your mouth to siphon coolant from 

the radiator, recovery bottle or any container. 

wash your hands thoroughly after handling. 

Never store used antifreeze in an open con-

tainer because animals are attracted to the 

smell and taste of antifreeze even though it is 

poisonous to them.

*

    do not use any chromate base rust inhibitor 

with ethylene glycol base antifreeze, or chro-

mium hydroxide (“green slime”) will form and 

cause overheating. engines that have been 

operated with a chromate base rust inhibitor 

must be chemically cleaned before adding eth-

ylene glycol base antifreeze. Using any high 

silicate antifreeze boosters or additives also 

will cause overheating. we also recommend 

that you do NoT use any soluble oil inhibitor 

for this equipment.

1.6 Liter Gas engine Service recommendations



8 kW - 35 kW small standby gEnERatOR sEts

Following is a recommended maintenance schedule for Generac small standby and residential generator sets 
from 8 kW to 35 kW in size, and applies to both diesel engine and gas engine driven units. The established 
intervals in the schedule are the maximum recommended when the unit is used in an average service applica-
tion.  They will need to be decreased (performed more frequently) if the unit is used in a severe application. 
Use the unit hour meter or calendar time, whichever occurs first, from the previous maintenance interval to 
determine the next required maintenance interval.

service maintenance interval information:

The various service maintenance intervals are designated by interval numbers as follows:
1   An early inspection of the generator set to insure it is ready to operate when required and to identify any 

potential problem areas.

   Performed monthly or following each 10 hours of operation of the unit and requires approximately .

man-hours per unit to complete.

   This inspection may be performed by the end user providing the following safety steps are taken to prevent 

the engine from starting automatically without warning:

 To prevent injury, perform the following steps in the order indicated before starting any maintenance:
 •

Disable the generator set from starting and/or connecting to the load by setting the control panel
Auto-Off-Manual switch to the “OFF” position.

 •

Remove the control panel fuse.

 •

Turn off the battery charger.

 •

Remove the negative battery cable.

*

  The battery charger must be turned off Before removing the battery cable to prevent an over current 

condition from burning out sensitive control panel components and circuits.

  Following all maintenance, reverse these steps to insure the unit is returned to standby setup for normal

operation when required.

2   A break-in service inspection of the generator set to insure it is ready to operate and carry the load when 

required, and to identify any potential problem areas.

   Performed 

ONLY ONCE following the first three months or the first 30 hours of operation after purchase 

of the unit and requires approximately 

2.5 man-hours per unit to complete.

   This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge 

to accomplish and should be performed only by an authorized Generac Service Dealer.

3   An  operational  inspection  of  the  generator  set  to  insure  it  is  ready  to  operate  and  carry  the  load  when 

required, and to identify any potential problem areas.

   Performed semi-annually or following each 50 hours of operation of the unit and requires approximately 

1.5 man-hours per unit to complete.

   This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge 

to accomplish and should be performed only by an authorized Generac Service Dealer.

4   A mid-level inspection of the generator set to insure it is ready to operate and carry the load when required, 

and to identify any potential problem areas.

   Performed annually or following each 100 hours of operation of the unit and requires approximately 

4.0 

man-hours per unit to complete.

   This inspection contains some maintenance tasks which require special tools, equipment, and/or knowledge 

to accomplish and should be performed only by an authorized Generac Service Dealer.



  Liter Gas engine Service recommendations

Maintenance Tasks

Level 1

Level 2

Level 3

Level 4

Recommended 

to be done 

monthly/ 10 hrs.

Task 

Comp. 

(Date-

Initials)

Required to be 

done 3 months/ 

Break-in /30 hrs.

Task 

Comp. 

(Date-

Initials)

Required to 

be done Semi-

Annually/50 hrs.

Task 

Comp. 

(Date-

Initials)

Required to be 
done Annually/ 

100 hrs.

Task 

Comp. 

(Date-

Initials)

1. Disable the unit from 

operating per the first 
page warning.

2. Check the engine oil 

level. Adjust as neces-
sary.

3. Check the engine cool-

ant level. Adjust as nec-
essary.

4. Check the engine cool-

ant thermal protection 
level. Correct as neces-
sary.

5. Check the natural gas 

delivery system on gas 
engine driven units. 
Tighten connections as 
necessary.

6. Check the diesel fuel 

supply level for diesel 
engine driven units. Fill 
as necessary.

7. Drain water and sedi-

ment from the diesel fuel 
tank on diesel engine 
driven units. 

8. Drain water from the 

fuel line water separa-
tor on diesel engine 
driven units if the unit is 
equipped with one.

9. Check the air inlets and 

outlets for debris. Clean 
as necessary.

10. Check the battery 

electrolyte level if 
accessible. Adjust as 
necessary.

11. Check the battery 

posts, cables, and 
charger for loose con-
nections, corrosion, 
and proper operation. 
Correct as necessary.

12. Check the unit wiring 

for loose connections, 
corrosion, and dam-
age. Correct as neces-
sary.

13. Check the engine 

accessory drive belts 
for wear, weather 
cracking, and damage. 
Replace as necessary.



1.6 Liter Gas engine Service recommendations

Maintenance Tasks

Level 1

Level 2

Level 3

Level 4

Recommended 

to be done 

monthly/ 10 hrs.

Task 

Comp. 

(Date-

Initials)

Required to be 

done 3 months/ 

Break-in /30 hrs.

Task 

Comp. 

(Date-

Initials)

Required to 

be done Semi-

Annually/50 hrs.

Task 

Comp. 

(Date-

Initials)

Required to be 
done Annually/ 

100 hrs.

Task 

Comp. 

(Date-

Initials)

14. Visually inspect the 

unit looking for leaks, 
wear or damage, loose 
connections or compo-
nents, and corrosion. 
Correct as necessary.

15. Test the engine and 

transfer switch safety 
devices. Correct and/or 
adjust as necessary.

16. Initiate an automatic 

start and transfer of the 
unit to site load and 
exercise it for at least 1 
hour looking for leaks, 
loose connections 
or components, and 
abnormal operating 
conditions. Correct as 
necessary.

17. Start and exercise the 

unit at full rated load 
(use a load bank if the 
site load is not enough) 
for at least 2 hours 
looking for leaks, loose 
connections or com-
ponents, and abnormal 
operating conditions. 
Correct as necessary.

18. Change the engine oil.

19. Replace the engine oil 

filter(s).

20. Replace the engine air 

filter(s).

21. Replace the engine 

fuel filter(s) on diesel 
engine driven units 
and re-prime the fuel 
system.

22. Check the engine 

spark plugs on gas 
engine driven units. 
Clean and re-gap orre-
place as necessary.

23. Perform a 5 minute no-

load operational run of 
the unit looking for any 
post service problems.

24. Return the unit to 

standby setup for oper-
ation when required.

 

 

 

 

 

 

 

 

 

Content   ..  1  2  3   ..