Nissan March K13. Manual - part 50

 

  Index      Nissan     Nissan March K13 - Service and Repair Manual)

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  48  49  50  51   ..

 

 

Nissan March K13. Manual - part 50

 

 

CHG-14

< BASIC INSPECTION >

DIAGNOSIS AND REPAIR WORKFLOW

• Stator  coil
Refer to 

CHG-28, "Inspection"

.

Are these normal?

YES

>> Replace IC voltage regulator and/or diode assembly.

NO

>> Repair as needed.

11.

INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS ON)

1.

Disconnect alternator connector and ground “L” harness side. 

2.

Turn the ignition switch ON. 

Does the charge warning lamp illuminate?

YES

>> GO TO 12.

NO

>> GO TO 13.

12.

DISASSEMBLE AND CHECK ALTERNATOR

Check the following conditions. 
• Rotor coil
• Rotor slip ring
• Brush
Refer to 

CHG-28, "Inspection"

.

Are these normal?

YES

>> Replace IC voltage regulator.

NO

>> Repair as needed.

13.

CHECK “L” TERMINAL CIRCUIT (OPEN)

Check “L” terminal circuit (open). Refer to 

CHG-20, "Diagnosis Procedure"

.

>> Repair as needed.

Except For Thailand

1.

PRELIMINARY INSPECTION

Perform the preliminary inspection. Refer to 

CHG-16, "Inspection Procedure"

.

>> GO TO 2.

2.

INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS ON)

Turn the ignition switch ON.

Does the charge warning lamp illuminate?

YES

>> GO TO 3.

NO

>> GO TO 10.

3.

INSPECTION WITH CHARGE WARNING LAMP (IDLING)

Start the engine and run it at idle.
Does the charge warning lamp turn OFF?

YES

>> GO TO 4.

NO

>> GO TO 5.

4.

INSPECTION WITH CHARGE WARNING LAMP (ENGINE AT 2,500 RPM)

Increase and maintain the engine speed at 2,500 rpm. 

Does the charge warning lamp illuminate?

YES

>> GO TO 7.

NO

>> INSPECTION END

5.

“L” TERMINAL CIRCUIT (SHORT) INSPECTION

Check “L” terminal circuit (short). Refer to 

CHG-22, "Diagnosis Procedure"

.

Is the inspection result normal?

YES

>> GO TO 6.

CHG

DIAGNOSIS AND REPAIR WORKFLOW

CHG-15

< BASIC INSPECTION >

C

D

E

F

G

H

I

J

K

L

B

A

O

P

N

NO

>> Repair as needed.

6.

“S” TERMINAL CIRCUIT INSPECTION

Check “S” terminal circuit. Refer to 

CHG-23, "Diagnosis Procedure"

Is the inspection result normal?

YES

>> GO TO 7.

NO

>> Repair as needed.

7.

MEASURE “B” TERMINAL VOLTAGE

Start engine. When keeping engine running at 2,500 rpm, measure “B” terminal voltage.
What voltage does the measurement result show?

Less than 13.0 V>>GO TO 8.
More than 16.0 V>>Replace IC voltage regulator.

8.

“B” TERMINAL CIRCUIT INSPECTION

Check “B” terminal circuit. Refer to 

CHG-19, "Diagnosis Procedure"

.

Is the inspection result normal?

YES

>> GO TO 9.

NO

>> Repair as needed.

9.

DISASSEMBLE AND CHECK ALTERNATOR

Check the following conditions. 
• Rotor coil
• Rotor slip ring
• Brush
• Stator  coil
Refer to 

CHG-28, "Inspection"

.

Are these normal?

YES

>> Replace IC voltage regulator and/or diode assembly.

NO

>> Repair as needed.

10.

INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS ON)

1.

Disconnect alternator connector and ground “L” harness side. 

2.

Turn the ignition switch ON. 

Does the charge warning lamp illuminate?

YES

>> GO TO 11.

NO

>> GO TO 12.

11.

DISASSEMBLE AND CHECK ALTERNATOR

Check the following conditions. 
• Rotor coil
• Rotor slip ring
• Brush
Refer to 

CHG-28, "Inspection"

.

Are these normal?

YES

>> Replace IC voltage regulator.

NO

>> Repair as needed.

12.

CHECK “L” TERMINAL CIRCUIT (OPEN)

Check “L” terminal circuit (open). Refer to 

CHG-20, "Diagnosis Procedure"

.

>> Repair as needed.

CHG-16

< BASIC INSPECTION >

CHARGING SYSTEM PRELIMINARY INSPECTION

CHARGING SYSTEM PRELIMINARY INSPECTION

Inspection Procedure

INFOID:0000000006057239

1.

CHECK BATTERY TERMINALS CONNECTION

Check if battery terminals are clean and tight.
Is the inspection result normal?

YES

>> GO TO 2.

NO

>> Repair battery terminals connection.

2.

CHECK FUSE

Check for blown fuse and fusible link.

Is the inspection result normal?

YES

>> GO TO 3.

NO

>> Be sure to eliminate the cause of malfunction before installing new fuse.

3.

CHECK “E” TERMINAL CONNECTION(ALTERNATOR GROUND)

Check if “E” terminal (alternator ground) is clean and tight.

Is the inspection result normal?

YES

>> GO TO 4.

NO

>> Repair “E” terminal (alternator ground) connection.

4.

CHECK DRIVE BELT TENSION

Check drive belt tension. Refer to 

EM-18, "Checking"

.

Is the inspection result normal?

YES

>> INSPECTION END

NO

>> Repair as needed.

Unit

Power source (Power supply terminals)

Fuse No.

Alternator

Battery (“S” terminal)

32

Combination meter

Ignition switch ON (“L” terminal)

5

CHG

POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM OPERATION 

INSPECTION

CHG-17

< BASIC INSPECTION >

C

D

E

F

G

H

I

J

K

L

B

A

O

P

N

POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM OPER-
ATION INSPECTION

Inspection Procedure

INFOID:0000000006069245

CAUTION:

When performing this inspection, always use a charged battery that has completed the battery inspec-
tion. (When the charging rate of the battery is low, the response speed of the voltage change will
become slow. This can cause an incorrect inspection.)

1.

CHECK ECM (CONSULT-III)

Perform ECM self-diagnosis with CONSULT-III. Refer to 

EC-57, "CONSULT-III Function"

.

Self-diagnostic results content

No malfunction detected>> GO TO 2.
Malfunction detected>> Check applicable parts, and repair or replace corresponding parts.

2.

CHECK OPERATION OF POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM

1.

Connect CONSULT-III and start the engine.

2.

The selector lever is in “P” or “N” position and all of the electric loads and A/C, etc. are turned OFF.

3.

Select “ALTERNATOR DUTY” at “Active Test” of “ENGINE”, and then check the value of “BATTERY
VOLT” monitor when DUTY value of “ALTERNATOR DUTY” is set to 40.0 %.

4.

Check the value of “BATTERY VOLT” monitor when DUTY value of “ALTERNATOR DUTY” is set to
80.0%.

Is the measurement value within the specification?

YES

>> INSPECTION END

NO

>> GO TO 3.

3.

CHECK IPDM E/R (CONSULT-III)

Perform IPDM E/R self-diagnosis with CONSULT-III. Refer to 

PCS-38, "CONSULT-III Function (IPDM E/R)"

.

Self-diagnostic results content

No malfunction detected>> GO TO 4.
Malfunction detected>> Check applicable parts, and repair or replace corresponding parts.

4.

CHECK HARNESS BETWEEN ALTERNATOR AND IPDM E/R

1.

Turn ignition switch OFF.

2.

Disconnect alternator connector and IPDM E/R connector.

3.

Check continuity between alternator harness connector and IPDM E/R harness connector.

4.

Check continuity between alternator harness connector and ground.

“BATTERY VOLT”

2 seconds after setting the 
DUTY value of “ALTERNA-
TOR DUTY” to 40.0 %

: 12 - 13.6 V

“BATTERY VOLT”

20 seconds after setting 
the DUTY value of “ALTER-
NATOR DUTY” to 80.0 %

: +0.5 V or more against 
the value of “BATTERY 
VOLT” monitor when 
DUTY value is 40.0 %

Alternator harness connector

IPDM E/R harness connector

Continuity

Connector

Terminal

Connector

Terminal

F15

5

 F113

48

Existed

 

 

 

 

 

 

 

Content   ..  48  49  50  51   ..