Nissan Juke F15. Manual - part 933

 

  Index      Nissan     Nissan Juke F15 (2015 year) - Service and Repair Manual

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  931  932  933  934   ..

 

 

Nissan Juke F15. Manual - part 933

 

 

LAN

A-BAG BRANCH LINE CIRCUIT

LAN-69

< DTC/CIRCUIT DIAGNOSIS >

[CAN SYSTEM (TYPE 1)]

C

D

E

F

G

H

I

J

K

L

B

A

O

P

N

A-BAG BRANCH LINE CIRCUIT

Diagnosis Procedure

INFOID:0000000012200542

WARNING:

• Before servicing, turn ignition switch OFF, disconnect battery negative terminal, and wait 3 minutes

or more. (To discharge backup capacitor.)

• Never use unspecified tester or other measuring device.

1.

CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Disconnect the battery cable from the negative terminal.

3. Check the terminals and connectors of the air bag diagnosis sensor unit for damage, bend and loose con-

nection (unit side and connector side).

Is the inspection result normal?

YES

>> GO TO 2.

NO

>> Replace the main harness.

2.

CHECK AIR BAG DIAGNOSIS SENSOR UNIT

Check the air bag diagnosis sensor unit. Refer to 

SRC-29, "Work Flow"

.

Is the inspection result normal?

YES

>> Replace the main harness.

NO

>> Replace parts whose air bag system has a malfunction.

LAN-70

< DTC/CIRCUIT DIAGNOSIS >

[CAN SYSTEM (TYPE 1)]

DLC BRANCH LINE CIRCUIT

DLC BRANCH LINE CIRCUIT

Diagnosis Procedure

INFOID:0000000012200543

1.

CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Disconnect the battery cable from the negative terminal.

3. Check the terminals and connectors of the data link connector for damage, bend and loose connection

(connector side and harness side).

Is the inspection result normal?

YES

>> GO TO 2.

NO

>> Repair the terminal and connector.

2.

CHECK HARNESS FOR OPEN CIRCUIT

Check the resistance between the data link connector terminals.

Is the measurement value within the specification?

YES (Present error)>>Check CAN system type decision again.

YES (Past error)>>Error was detected in the data link connector branch line circuit.

NO

>> Repair the data link connector branch line.

Data link connector

Resistance (

Ω)

Connector No.

Terminal No.

M4

6

14

Approx. 54 – 66

LAN

EPS BRANCH LINE CIRCUIT

LAN-71

< DTC/CIRCUIT DIAGNOSIS >

[CAN SYSTEM (TYPE 1)]

C

D

E

F

G

H

I

J

K

L

B

A

O

P

N

EPS BRANCH LINE CIRCUIT

Diagnosis Procedure

INFOID:0000000012200544

1.

CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Disconnect the battery cable from the negative terminal.

3. Check the terminals and connectors of the EPS control unit for damage, bend and loose connection (unit

side and connector side).

Is the inspection result normal?

YES

>> GO TO 2.

NO

>> Repair the terminal and connector.

2.

CHECK HARNESS FOR OPEN CIRCUIT

1. Disconnect the connector of EPS control unit.

2. Check the resistance between the EPS control unit harness connector terminals.

Is the measurement value within the specification?

YES

>> GO TO 3.

NO

>> Repair the EPS control unit branch line.

3.

CHECK POWER SUPPLY AND GROUND CIRCUIT

Check the power supply and the ground circuit of the EPS control unit. Refer to 

STC-21, "Diagnosis Proce-

dure"

.

Is the inspection result normal?

YES (Present error)>>Replace the EPS control unit. Refer to 

ST-11, "Removal and Installation"

.

YES (Past error)>>Error was detected in the EPS control unit branch line.

NO

>> Repair the power supply and the ground circuit.

EPS control unit harness connector

Resistance (

Ω)

Connector No.

Terminal No.

M37

2

1

Approx. 54 – 66

LAN-72

< DTC/CIRCUIT DIAGNOSIS >

[CAN SYSTEM (TYPE 1)]

M&A BRANCH LINE CIRCUIT

M&A BRANCH LINE CIRCUIT

Diagnosis Procedure

INFOID:0000000012200545

1.

CHECK CONNECTOR

1. Turn the ignition switch OFF.

2. Disconnect the battery cable from the negative terminal.

3. Check the terminals and connectors of the combination meter for damage, bend and loose connection

(unit side and connector side).

Is the inspection result normal?

YES

>> GO TO 2.

NO

>> Repair the terminal and connector.

2.

CHECK HARNESS FOR OPEN CIRCUIT

1. Disconnect the connector of combination meter.

2. Check the resistance between the combination meter harness connector terminals.

Is the measurement value within the specification?

YES

>> GO TO 3.

NO

>> Repair the combination meter branch line.

3.

CHECK POWER SUPPLY AND GROUND CIRCUIT

Check the power supply and the ground circuit of the combination meter. Refer to 

MWI-53, "COMBINATION

METER : Diagnosis Procedure"

.

Is the inspection result normal?

YES (Present error)>>Replace the combination meter. Refer to 

MWI-64, "Removal and Installation"

.

YES (Past error)>>Error was detected in the combination meter branch line.

NO

>> Repair the power supply and the ground circuit.

Combination meter harness connector

Resistance (

Ω)

Connector No.

Terminal No.

M34

1

2

Approx. 54 – 66

 

 

 

 

 

 

 

Content   ..  931  932  933  934   ..