|
|
ECM EC-109 < ECU DIAGNOSIS INFORMATION > [MR FOR NISMO RS MODELS] C D E F G H I J K L M A EC N P O 95 (L) 127 (B/Y) EVAP canister purge vol- Output [Engine is running] even slightly, after engine starting BATTERY VOLTAGE (11 - 14 V) [Engine is running] (More than 100 seconds after start- 10 V 99 (P) — CAN communication line Input/ Output — — 100 (L) — CAN communication line Input/ Output — — 101 (V) — Sensor power supply — [Ignition switch: ON] 5 V 102 (R) 105 (GR) Accelerator pedal posi- Input [Ignition switch: ON] 0.6 - 0.9 V [Ignition switch: ON] 3.9 - 4.7 V 103 (BR) 127 (B/Y) PNP signal Input [Ignition switch: ON] (M/T) BATTERY VOLTAGE (11 - 14 V) [Ignition switch: ON] 0 V 104 (R) 127 (B/Y) Data link connector Input/ Output [Ignition switch: ON] 10.5 V 105 (GR) — Sensor ground — — — 106 (Y) 127 (B/Y) Power supply for ECM Input [Ignition switch: OFF] BATTERY VOLTAGE (11 - 14 V) 108 (GR) 127 (B/Y) Clutch pedal position Input [Ignition switch: ON] 0 V [Ignition switch: ON] BATTERY VOLTAGE (11 - 14 V) 109 (O) 127 (B/Y) Ignition switch Input [Ignition switch: OFF] 0 V [Ignition switch: ON] BATTERY VOLTAGE (11 - 14 V) Terminal No. (Wire color) Description Condition Value (Approx.) + − Signal name Input/ Output JMBIA0327GB JMBIA0328GB |