|
|
MULTIPORT FUEL INJECTION (MFI) DIAGNOSIS TSB Revision MULTIPORT FUEL INJECTION (MFI) <2.4L ENGINE> 13A-718 (5) Measure the voltage between terminal 23 and ground. • The voltage should measure between 2.0 and 3.0 volts. (6) Install the fuel cap. YES : Go to Step 16. STEP 3. Measure the 5-volt reference signal at PCM AC211194 AB SPECIAL TOOL 23-PIN AC306248 B-20 HARNESS CONNECTOR: COMPONENT SIDE AB B-20 CONNECTOR: B-20 PCM AIR |