|
|
Content .. 1012 1013 1014 1015 ..
MULTIPORT FUEL INJECTION (MFI) DIAGNOSIS TSB Revision MULTIPORT FUEL INJECTION (MFI) <3.8L ENGINE> 13B-356 STEP 3. Measure the power supply voltage at left bank (1) Disconnect the connector B-25 and measure at the harness side. (2) Turn the ignition switch to the "ON" position. (3) Measure the voltage between terminal No. 1 and ground. • Voltage should be battery positive voltage. (4) Turn the ignition switch to the "LOCK" (OFF) position. present? AK303071 1 2 3 4 LEFT BANK CONNECTOR: B-25 B-25 (B) AB HARNESS AKX01498 B-25 HARNESS 1 2 3 4 BB |