- Electric test of injector solenoid valves with engine OFF. - Injector efficiency test with engine started (cut-out test). - High pressure system efficiency test with engine started (rail pressure step test). The initial conditions are: Engine on idle - Initial pressure in kPa Press START; three other pushbuttons will be displayed: STOP - STEP UP - STEP DOWN Press on STEP UP making the rail operation pressure rise up Let the engine run in these conditions for 5 minutes and see Then press STEP DOWN in order to bring the pressure back Press STOP to finish the test. During the injector operation inspection, the NOTE 62 SECTION 3 - INDUSTRIAL APPLICATION VECTOR 8 ENGINES Base - April 2006 Print P2D32V001E |