Nissan Titan A60. Manual - part 302

 

  Index      Nissan     Nissan Titan A60 (2011 year) - Service and Repair Manual

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  300  301  302  303   ..

 

 

Nissan Titan A60. Manual - part 302

 

 

PREPARATION

DLN-147

< PREPARATION >

[PROPELLER SHAFT: 3S1410]

C

E

F

G

H

I

J

K

L

M

A

B

DLN

N

O

P

PREPARATION

PREPARATION

Commercial Service Tool

INFOID:0000000006179531

Tool name

Description

Power tool

Loosening bolts and nuts

205-D002
Bearing splitter

Removing center support bearing

PBIC0190E

ZZA0700D

DLN-148

< SYSTEM DESCRIPTION >

[PROPELLER SHAFT: 3S1410]

NOISE, VIBRATION, AND HARSHNESS (NVH) TROUBLESHOOTING

SYSTEM DESCRIPTION

NOISE, VIBRATION, AND HARSHNESS (NVH) TROUBLESHOOTING

NVH Troubleshooting Chart

INFOID:0000000006179532

Use the chart below to help you find the cause of the symptom. If necessary, repair or replace these parts.

×: Applicable

Reference page

DLN-149, "

O

n

-V

ehicle Service

"

DLN-149, "

O

n

-V

ehicle Service

"

DLN-149, "

O

n

-V

ehicle Service

"

DL

N-21

7, "

NVH T

rou

bl

es

ho

ot

in

g Ch

art

"

RA

X

-4, "

NVH T

rou

bl

es

ho

ot

ing

 Cha

rt

"

RS

U-

4

, "

NV

H T

rou

bl

es

ho

oti

ng

 Cha

rt

"

WT

-42, "

NVH T

rou

bl

es

ho

ot

ing

 Cha

rt

"

WT

-42, "

NVH T

rou

bl

es

ho

ot

ing

 Cha

rt

"

 

FAX-4, "

NVH T

rou

ble

sh

oo

tin

g Chart

"

BR-5, "

NVH T

rou

bl

es

ho

oti

ng

 Cha

rt

"

ST

-5, "

NVH T

rou

bl

es

ho

ot

in

g Cha

rt

"

Possible cause and suspected parts

Une

ven

 rot

a

tion

 torq

ue

Rot

ati

on

 im

ba

la

nc

e

Ex

ce

ss

iv

e run

 ou

t

Di

ffere

n

tial

Axle 

Su

sp

en

si

on

Ti

re

s

Road wheel

Driv

e sh

af

t

Brak

es

S

tee

ring

Symptom

Noise

×

×

×

×

×

×

×

×

×

×

×

Shake

×

×

×

×

×

×

×

Vibration

×

×

×

×

×

×

×

×

REAR PROPELLER SHAFT

DLN-149

< REMOVAL AND INSTALLATION >

[PROPELLER SHAFT: 3S1410]

C

E

F

G

H

I

J

K

L

M

A

B

DLN

N

O

P

REMOVAL AND INSTALLATION

REAR PROPELLER SHAFT

On-Vehicle Service

INFOID:0000000006179533

PROPELLER SHAFT VIBRATION

NOTE:

If vibration is present at high speed, check propeller shaft runout first, then check mounting between propeller

shaft and companion flange.

1. Measure the runout of the propeller shaft tube at several points

by rotating the final drive companion flange with your hands.

Refer to 

DLN-157, "General Specification"

.

2. If the runout still exceeds specifications, disconnect the propeller

shaft at the final drive companion flange; then rotate the com-

panion flange 90

°, 180°, 270° and reconnect propeller shaft.

3. Check the runout again. If the runout still exceeds specifications,

replace the propeller shaft assembly.

4. After installation, check for vibration by driving vehicle.

INSPECTION

Inspect the propeller shaft tube for dents or cracks. If damaged, replace the propeller shaft assembly.

SDIA1781E

DLN-150

< UNIT REMOVAL AND INSTALLATION >

[PROPELLER SHAFT: 3S1410]

REAR PROPELLER SHAFT

UNIT REMOVAL AND INSTALLATION

REAR PROPELLER SHAFT

Removal and Installation

INFOID:0000000006179534

2WD Models (short wheel base)

AWDIA0786GB

1.

Propeller shaft tube

2.

Snap ring

3.

Journal bearing

4.

Sleeve yoke

5.

Journal

6.

Center support bearing

7.

Center support bearing bracket

8.

Clamp

9.

Boot

10. Slip yoke

11. Flange yoke

: Front

 

 

 

 

 

 

 

Content   ..  300  301  302  303   ..