|
|
Content .. 1083 1084 1085 1086 ..
7A2-56 TRANSMISSION CONTROL SYSTEM (JR405E) 5 1. Test the control circuit between the TCM (pin 2. Repair the circuit(s) as necessary. Did you find and correct the condition? — Go to Step 12 Go to Step 11 6 1. Test the control circuit between the TCM (pin • An open circuit • A short to ground • High resistance 2. Repair the circuit(s) as necessary. Did you find and correct the condition? — Go to Step 12 Go to Step 7 7 1. Turn OFF the ignition. 2. Disconnect the TCM harness connector. 3. Inspect for an intermittent and for a poor 4. Repair the connection(s) as necessary. Did you find and correct the condition? — Go to Step 12 Go to Step 11 8 1. Inspect for an intermittent and for a poor 2. Repair the connection(s) as necessary. Did you find and correct the condition? — Go to Step 12 Go to Step 9 9 1. Remove the transmission oil pan. Refer to 2. Inspect the PC solenoid valve for the following • Physical damage of solenoid valve • Loose or improper installation of solenoid valve 3. Inspect for an intermittent and for a poor 4. Test the control circuit between the PC • An open circuit • A short to ground • A short to the other solenoid valve circuit • High resistance 5. Repair the connection(s) or circuit(s) as Did you find and correct the condition? — Go to Step 12 Go to Step 10 10 Replace the PC solenoid valve. Refer to repair Did you complete the replacement? — Go to Step 12 — Step Action Value(s) Yes No |