Chrysler 300/300 Touring/300C, Dodge Magnum. Manual - part 1862

 

  Index      Chrysler     Chrysler 300/300 Touring/300C, Dodge Magnum - service repair manual

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  1860  1861  1862  1863   ..

 

 

Chrysler 300/300 Touring/300C, Dodge Magnum. Manual - part 1862

 

 

4. Slide return hose (1) onto reservoir (2). Install

clamp securing hose in place.

5. Install upper radiator closure panels.

6. Install air cleaner housing and inlet tube. (Refer to

9 - ENGINE/AIR INTAKE SYSTEM/AIR CLEANER
HOUSING - INSTALLATION)

7. Connect battery negative cable (2) to battery post.

It is important that this is performed properly. (Refer
to 8 - ELECTRICAL/BATTERY SYSTEM - STAN-
DARD PROCEDURE)

8. Fill pump reservoir with fluid and perform pump ini-

tial operation procedure. (Refer to 19 - STEERING/
PUMP - STANDARD PROCEDURE)

19 - 266

PUMP

LX

GEAR TO COOLER - AWD

1. Route cooler end of return hose (3) over stabilizer

bar from rear using the reverse of how it was
removed.

NOTE: Always use a NEW O-ring on the end of the
return hose at the steering gear.

2. Lubricate NEW O-ring on steering gear end of

return hose with clean power steering fluid.

3. Lift gear end of return hose and insert into return

port on steering gear (2). Install return hose tube
nut (1). Do not tighten tube nut at this time.

LX

PUMP

19 - 267

4. Position return hose routing clamps on right side of

engine cradle (2) and install screws (1) securing
hose (3) in place.

5. Tighten return hose tube nut (1) at steering gear to

47 N·m (35 ft. lbs.).

6. Route cooler end of return hose (1) under head-

lamp mounting crossmember (3) as shown.

7. Place hose in routing clip (2) on cooling module.

19 - 268

PUMP

LX

8. Slide return hose (1) onto end of cooler (2). Install

clamp securing hose in place.

9. Install belly pan. (Refer to 23 - BODY/EXTERIOR/

BELLY PAN - INSTALLATION)

10. Lower vehicle.

11. Connect battery negative cable (2) to battery post.

It is important that this is performed properly.
(Refer to 8 - ELECTRICAL/BATTERY SYSTEM -
STANDARD PROCEDURE)

12. Fill pump reservoir with fluid and perform pump

initial operation procedure. (Refer to 19 - STEER-
ING/PUMP - STANDARD PROCEDURE)

LX

PUMP

19 - 269

 

 

 

 

 

 

 

Content   ..  1860  1861  1862  1863   ..