|
|
CHG-24 < PERIODIC MAINTENANCE > CHARGING SYSTEM PRELIMINARY INSPECTION PERIODIC MAINTENANCE CHARGING SYSTEM PRELIMINARY INSPECTION Inspection Procedure INFOID:0000000006260563 1. CHECK BATTERY TERMINALS CONNECTION Check if battery terminals are clean and tight. Is the inspection result normal? YES >> GO TO 2. NO >> Repair battery terminals connection. 2. CHECK FUSE Check for blown fuse. Is the inspection result normal? YES >> GO TO 3. NO >> Be sure to eliminate the cause of malfunction before installing new fuse. 3. CHECK “E” TERMINAL CONNECTION Check if “E” terminal (alternator ground harness) is clean and tight. YES >> GO TO 4. NO >> Repair “E” terminal connection. 4. CHECK DRIVE BELT TENSION Check drive belt tension. Refer to . Is the inspection result normal? YES >> INSPECTION END NO >> Repair as needed. Unit Power source (Power supply terminals) Fuse No. Alternator Battery (“S” terminal) 38 Combination meter Ignition switch ON (“L” terminal) 4 Revision: 2011 November 2011 MURANO |