|
|
ELECTRIC CONTROLLED COUPLING RFD-13 C E F G H I J K L M A B RFD Revision: 2006 August 2006 Murano INSTALLATION 1. Install electric controlled coupling to spline of drive pinion inside CAUTION: ● Align the pin on electric controlled coupling with the ● Be careful not to damage center oil seal. 2. Set AWD solenoid harness guide to gear carrier. 3. Apply liquid gasket to mating surface of coupling cover. Overlap ● Use Genuine Silicone RTV or equivalent. Refer to "RECOMMENDED CHEMICAL PRODUCTS AND SEAL- CAUTION: Remove old sealant adhering to the mounting surfaces. 4. Install coupling cover to gear carrier with arrow facing upward, 5. Tighten reamer bolts and coupling cover mounting bolts to the . 6. Install electric controlled coupling breather hose to coupling 7. Install connector bracket and connect AWD solenoid harness 8. Install companion flange. 9. Install companion flange lock nut with flange wrench, tighten to CAUTION: Do not reuse companion flange lock nut. 10. Install propeller shaft. Refer to PR-4, "Removal and Installation" . PDIA0463E PDIA0613E SDIA0587E PDIA0455E |