|
|
FRONT DRIVE SHAFT FAX-15 C E F G H I J K L M A B FAX Revision: 2005 August 2005 Murano 2. Wind serrated part of shaft with tape. Install new boot band and CAUTION: Discard old boot band and boot; replace with new one. 3. Remove protective tape wound around serrated part of shaft. 4. Attach new circular clip to shaft. At this time, circular clip must fit CAUTION: Discard old circular clip; replace with new one. 5. Insert the amount of new grease (NISSAN genuine grease or equivalent) listed below into housing from 6. Install boot securely into grooves (indicated by * marks) shown CAUTION: If there is grease on boot mounting surfaces (indicated by* 7. Make sure boot installation length “L” is the length indicated CAUTION: ● Boot may brake if boot installation length is less than standard value. ● Be careful that screwdriver tip does not contact inside surface of boot. 8. Install new larger and smaller boot bands securely with a suit- SFA800 RAC0049D Grease amount : 145 - 165 g (5.11 - 5.82 oz) Boot installation length “L” : 120.8 mm (5.05 in) SDIA1505E RAC1133D |