|
|
EM-108 < UNIT DISASSEMBLY AND ASSEMBLY > [VQ35HR] CYLINDER HEAD • Rear timing chain case: Refer to . • Camshaft: Refer to . 2. Remove cylinder head. figure with cylinder head bolt wrench (commercial service tool) 3. Remove cylinder head gaskets. 4. Remove valve lifter. 5. Remove valve collet. KV10116200 (J-26336-A)] (A), the attachment [SST: — )] (B). Remove valve collet with a magnet hand. CAUTION: When working, take care not to damage valve lifter holes. 6. Remove valve spring retainer, valve spring and valve spring seat. 7. Push valve stem to combustion chamber side, and remove valve. 8. Remove valve oil seal using the valve oil seal puller [SST: 9. Remove valve seat, if valve seat must be replaced. A : Bank 1 B : Bank 2 : Engine front JPBIA0172ZZ JPBIA0180ZZ JPBIA0177ZZ |