|
|
EM-68 < REMOVAL AND INSTALLATION > [VQ35HR] TIMING CHAIN 13. Install rocker covers (bank 1 and bank 2). Refer to . 14. Install crankshaft pulley as per the following: Fix crankshaft using the ring gear stopper [SST: KV10118600 (J-48641)]. b. Install crankshaft pulley, taking care not to damage front oil seal. c. Tighten crankshaft pulley bolt. d. Place a matching mark (A) on crankshaft pulley (2) aligning with e. Rotate crankshaft pulley in normal direction (clockwise when viewed from front) to confirm it turns 15. Install drive belt auto-tensioner bracket (1) and power steering oil pump bracket (2) as per the following: a. Install drive belt auto-tensioner bracket, and tighten mounting b. Tighten mounting bolts No. 2, 3. (specified torque) c. Install power steering oil pump bracket, and tighten mounting d. Tighten mounting bolts No. 1. (specified torque) e. Tighten mounting bolts No. 4, 5. (specified torque) 16. For the following operations, perform steps in the reverse order of removal. Inspection INFOID:0000000005245148 INSPECTION AFTER REMOVAL Timing Chain : 44.1 N·m (4.5 kg-m, 33 ft-lb) JPBIA0120ZZ 3 : Crankshaft pulley A : Engine front side B : Engine right side : Engine front JPBIA1786ZZ |