|
|
REPLACEMENT ), then go to step 30 . Fig. 115: Measuring The Voltage Between PCM Connector Terminals C19 & A8 Or A9 22. Shift to the P position. Start the engine, and let it idle. 23. With the engine idling, measure the voltage between PCM connector terminals C19 and A8 or A9. Is there 1.5 V-3.5 V? YES: Update the PCM if it does not have the latest software, or substitute a known-good NO: Replace the mainshaft speed sensor (see MAINSHAFT SPEED SENSOR
2004 Acura TSX 2004 AUTOMATIC TRANSMISSIONS Diagnosis - MCTA 5-Speed
|