|
|
Fig. 157: Installing The New Gasket 21. Install the end cover (D), and tighten the three special bolts (E) and the 6 x 1.0 mm bolts (12 bolts). 22. Install the harness clamp brancket (F) on the end cover. 23. Set the control shaft (A) to the N position by turning the control lever on the torque converter side. NOTE: Do not squeeze the end of the control shaft tips together when turning the
2004 Acura TSX 2004 AUTOMATIC TRANSMISSIONS A/T Overhaul (MCTA) - TSX
|