Land Rover Engine 1.8 Litre K Series. Manual - part 7

 

  Index      Land Rover     Land Rover Engine 1.8 Litre K Series - service manual 2000 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  5  6  7  8   ..

 

 

Land Rover Engine 1.8 Litre K Series. Manual - part 7

 

 

ENGINE

14

OVERHAUL

Oil pump assembling

1. Ensure outer rotor identification marking faces

outward.

2. Lubricate pump rotors with engine oil.
3. Lubricate a new cover plate seal with engine

oil.

4. Fit cover plate seal and cover plate.
5. Apply Loctite 222 to cover plate securing

screws, fit and tighten screws.

6. Check that pump rotates freely.

Oil pump - refit

1. Clean oil pump.
2. Using gasket removal spray and a plastic

scraper, remove all traces of gasket from oil
pump.

3. Clean oil seal running surface on crankshaft.
4. Fit a new, dry, oil pump gasket.
5. Turn oil pump rotor to align drive with

crankshaft.

6. Fit oil seal protector sleeve, from seal kit, over

crankshaft end.

NOTE: This will assist in locating oil pump
inner rotor.

7. Fit oil pump, fit new Patchlok bolts, M6 x 20

bolt at position 3.

8. Tighten in sequence shown to 10 Nm.

ENGINE

OVERHAUL

15

9. Ensure oil seal protector sleeve is located over

end of crankshaft.

10. Position new seal on crankshaft against oil

pump housing. Drift seal into position using tool
LRT-12-137.

CAUTION: Oil seal must be fitted dry.

11. Remove tool LRT-12-137 and oil seal

protector sleeve.

12. Clean crankshaft timing gear.
13. Fit crankshaft timing gear.
14. Fit and adjust a new camshaft timing belt.

COOLANT PUMP

Remove

1. Remove and discard camshaft timing belt.

2. Remove bolt securing timing belt rear cover to

coolant pump.

3. Remove 3 bolts and 2 pillar bolts securing

coolant pump.

4. Release coolant pump from 2 dowels and rear

cover.

5. Remove coolant pump.
6. Remove and discard ’O’ ring from pump.

ENGINE

16

OVERHAUL

Inspection

1. Check for movement of pump spindle in

bearing and for coolant leakage from seal.

Refit

1. Clean pump, mating face and dowels.
2. Fit new ’O’ ring to coolant pump, use RTV

sealant to retain ’O’ ring.

3. Fit coolant pump to cylinder block, tighten bolts

in sequence shown to 10 Nm.

4. Fit and adjust a new camshaft timing belt.

ENGINE

OVERHAUL

17

THERMOSTAT

Remove

1. Remove 2 bolts securing water rail to cylinder

block, release rail from thermostat housing.

2. Remove bolt securing thermostat housing and

dipstick tube to cylinder block.

3. Withdraw thermostat housing from coolant

pump.

4. Remove and discard ’O’ rings from thermostat

housing and cover.

5. Remove 3 bolts and remove cover from

thermostat housing.

6. Withdraw thermostat from housing.
7. Remove and discard seal from thermostat.

Inspection

1. Test thermostat using thermostat test

equipment, renew thermostat if necessary:-
Starts to open = 85

°

to 91

°

C

Thermostat fully open = 100

°

C

 

 

 

 

 

 

 

Content   ..  5  6  7  8   ..