|
|
TRANSFER BOX 2 OVERHAUL FRONT OUTPUT SHAFT DRIVE FLANGE Service repair no - 41.20.15/01 Remove 1. Using LRT-51-003 to restrain front output shaft drive flange, remove and discard nut securing 2. Collect washer and seal. 3. Using LRT-99-500 if necessary, remove drive flange from front output shaft. Refit 1. Clean running surface of drive flange. Ensure all traces of rubber are removed. CAUTION: Do not use a metal scraper as 2. Fit drive flange to front output shaft. shaft. 4. Using LRT-51-003 to restrain drive flange, tighten nut to 220 Nm. (162 lbf.ft) |