|
|
22. CAUTION: A new O-ring seal is to be installed. Connect the high-pressure power steering line to the power steering Torque: 24 Nm 22. Secure the power steering high-pressure line. Torque: 10 Nm 23. Install the gear selector cables. 24. Connect the brake booster vacuum hose. 25. Connect the ECM electrical connectors. 26. Install the intake air duct. 27. Install the charge air cooler inlet pipe. Torque: 10 Nm 28. Install the front subframe. Refer to: Front Subframe (502-00 Uni-Body, Subframe and Mounting System, Removal and Installation). 29. Install the lower engine stabilizer bar. Refer to: Engine Lower Support Insulator (303-01A Engine - I6 3.2L Petrol, Removal and Installation). 30. Install the catalytic converter. Refer to: Catalytic Converter - Vehicles Without: Diesel Particulate Filter (DPF) (309-00B Exhaust System - TD4 2.2L Diesel, Removal and Installation). 31. Refill and bleed the cooling system. Refer to: Cooling System Draining, Filling and Bleeding (303-03B Engine Cooling - TD4 2.2L Diesel, General Procedures). 32. Install the air cleaner assembly. Refer to: Air Cleaner (303-12A Intake Air Distribution and Filtering - I6 3.2L Petrol, Removal and Installation). 33. Install the battery tray. Refer to: Battery Tray (414-01 Battery, Mounting and Cables, Removal and Installation). 34. Install the plenum chamber access panel. Refer to: Plenum Chamber (412-01 Climate Control, Removal and Installation). 35. |