|
|
CHG POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM OPERATION INSPECTION CHG-17 < BASIC INSPECTION > C D E F G H I J K L B A O P N POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM OPER- Inspection Procedure INFOID:0000000006274867 CAUTION: When performing this inspection, always use a charged battery that has completed the battery inspec- 1. CHECK ECM (CONSULT-III) Perform ECM self-diagnosis with CONSULT-III. Refer to Self-diagnostic results content No malfunction detected>> GO TO 2. 2. CHECK OPERATION OF POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM 1. Connect CONSULT-III and start the engine. 2. shift the selector lever to “P” or “N” position and turn off all of the electric loads and A/C, etc. 3. Select “ALTERNATOR DUTY” at “Active Test” of “ENGINE”, and then check the value of “BATTERY 4. Check the value of “BATTERY VOLT” monitor when DUTY value of “ALTERNATOR DUTY” is set to Is the measurement value within the specification? YES >> INSPECTION END NO >> GO TO 3. 3. CHECK IPDM E/R (CONSULT-III) Perform IPDM E/R self-diagnosis with CONSULT-III. Refer to PCS-12, "CONSULT-III Function (IPDM E/R)" Self-diagnostic results content No malfunction detected>> GO TO 4. 4. CHECK HARNESS BETWEEN ALTERNATOR AND IPDM E/R 1. Turn ignition switch OFF. 2. Disconnect alternator harness connector and IPDM E/R harness connector. 3. Check continuity between alternator harness connector and IPDM E/R harness connector. 4. Check continuity between alternator harness connector and ground. “BATTERY VOLT” 2 seconds after setting the : 12 - 13.6 V “BATTERY VOLT” 20 seconds after setting : +0.5 V or more against Alternator IPDM E/R Continuity Connector Terminal Connector Terminal E205 5 E13 33 Existed |