Infiniti G35 (V35) Sedan. Manual - part 1003

 

  Index      Infiniti     Infiniti G35 (V35) Sedan - service repair manual 2007 year

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  1001  1002  1003  1004   ..

 

 

Infiniti G35 (V35) Sedan. Manual - part 1003

 

 

PCS-66

< COMPONENT DIAGNOSIS >

[POWER DISTRIBUTION SYSTEM]

POWER SUPPLY AND GROUND CIRCUIT

POWER SUPPLY AND GROUND CIRCUIT

BCM

BCM : Diagnosis Procedure

INFOID:0000000000964241

1.

CHECK FUSE AND FUSIBLE LINK

Check that the following fuse and fusible link are not blown.

Is the fuse fusing?

YES

>> Replace the blown fuse or fusible link after repairing the affected circuit if a fuse or fusible link is

blown.

NO

>> GO TO 2.

2.

CHECK POWER SUPPLY CIRCUIT

1.

Turn ignition switch OFF.

2.

Disconnect BCM connectors.

3.

Check voltage between BCM harness connector and ground.

Is the measurement value normal?

YES

>> GO TO 3.

NO

>> Repair harness or connector.

3.

CHECK GROUND CIRCUIT

Check continuity between BCM harness connector and ground.

Does continuity exist?

YES

>> INSPECTION END

NO

>> Repair harness or connector.

BCM : Special Repair Requirement

INFOID:0000000000964242

1.

REQUIRED WORK WHEN REPLACING BCM

Initialize IVIS by CONSULT-III. For the details of initialization refer to CONSULT-III operation manual NATS-
IVIS/NVIS.

>> Work end.

IPDM E/R (INTELLIGENT POWER DISTRIBUTION MODULE ENGINE ROOM)

IPDM E/R (INTELLIGENT POWER DISTRIBUTION MODULE ENGINE ROOM) : Di-
agnosis Procedure

INFOID:0000000000964243

Terminal No.

Signal name

Fuse and fusible link No.

1

Battery power supply

K

11

10

Terminals

Voltage

(Approx.)

(+)

(

)

BCM

Ground

Connector

Terminal

M118

1

Battery voltage

M119

11

BCM

Ground

Continuity

Connector

Terminal

M119

13

Existed

PCS

POWER SUPPLY AND GROUND CIRCUIT

PCS-67

< COMPONENT DIAGNOSIS >

[POWER DISTRIBUTION SYSTEM]

C

D

E

F

G

H

I

J

K

L

B

A

O

P

N

1.

CHECK FUSES AND FUSIBLE LINK

Check that the following IPDM E/R fuses or fusible links are not blown.

Is the fuse fusing?

YES

>> Replace the blown fuse or fusible link after repairing the affected circuit if a fuse or fusible link is

blown.

NO

>> GO TO 2.

2.

CHECK POWER SUPPLY CIRCUIT

1.

Turn ignition switch OFF.

2.

Disconnect IPDM E/R connector.

3.

Check voltage between IPDM E/R harness connector and ground.

Is the measurement value normal?

YES

>> GO TO 3.

NO

>> Repair harness or connector.

3.

CHECK GROUND CIRCUIT

Check continuity between IPDM E/R harness connectors and ground.

Does continuity exist?

YES

>> INSPECTION END

NO

>> Repair harness or connector.

Terminal No.

Signal name

Fuses and fusible link No.

1

Battery power supply

C

50

51

Terminals

Voltage

(Approx.)

(+)

(

)

IPDM E/R

Connector

Terminal

Ground

E4

1

Battery voltage

2

IPDM E/R

Ground

Continuity

Connector

Terminal

E5

12

Existed

E6

41

PCS-68

< COMPONENT DIAGNOSIS >

[POWER DISTRIBUTION SYSTEM]

PUSH-BUTTON IGNITION SWITCH POSITION INDICATOR

PUSH-BUTTON IGNITION SWITCH POSITION INDICATOR

Description

INFOID:0000000000964244

The switch that changes the power supply position.
BCM maintains the power supply position status.
BCM changes the power supply position with the operation of the push-button ignition switch.

Component Function Check

INFOID:0000000000964245

1.

CHECK FUNCTION

 With CONSULT-III

1.

Check push-button ignition switch (“LOCK INDICATOR”,“ACC INDICATOR” and “IGNITION ON IND”) in
Active Test Mode with CONSULT-III.

Is the inspection result normal?

YES

>> INSPECTION END.

NO

>> Refer to 

PCS-68, "Diagnosis Procedure"

.

Diagnosis Procedure

INFOID:0000000000964246

1.

CHECK PUSH-BUTTON IGNITION SWITCH INPUT SIGNAL

1.

Turn ignition switch OFF.

2.

Disconnect push-button ignition switch harness connector.

3.

Check voltage between push-button ignition switch harness connector and ground.

Is the inspection normal?

YES

>> GO TO 2.

NO

>>

Check the following.

• 10A fuse [No.9, located in fuse block (J/B)]
• Harness for open or short between push-button ignition switch and fuse

2.

CHECK PUSH-BUTTON IGNITION SWITCH CIRCUIT

1.

Disconnect BCM harness connector and push button ignition switch harness connector.

2.

Check continuity between BCM harness connector and push-button ignition switch harness connector.

3.

Check continuity between BCM harness connector and ground.

Test item

Description

LOCK INDICATOR
ACC INDICATOR
IGNITION ON IND

ON

Position indicator

: Illuminate

OFF

: Not illuminate

Push-button ignition switch

Ground

Voltage [V]

Connector

Terminal

M50

8

Ground

Battery voltage

Indicator

 BCM Connector

Terminal

 Push-button ignition 

switch connector

Terminal

Continuity

LOCK

M123

134

M50

5

Existed

ACC

M119

15

6

ON

M122

93

7

Indicator

BCM connector

Terminal

Ground

Continuity

LOCK

M123

134

Ground

Not existed

ACC

M119

15

ON

M122

93

PCS

PUSH-BUTTON IGNITION SWITCH POSITION INDICATOR

PCS-69

< COMPONENT DIAGNOSIS >

[POWER DISTRIBUTION SYSTEM]

C

D

E

F

G

H

I

J

K

L

B

A

O

P

N

Is the inspection normal?

YES

>> GO TO 3.

NO

>> Repair harness or connector.

3.

CHECK PUSH-BUTTON IGNITION SWITCH

Refer to 

PCS-69, "Component Inspection"

.

Is the inspection normal?

YES

>> GO TO 4.

NO

>> Replace push-button ignition switch

4.

CHECK INTERMITTENT INCIDENT

Refer to 

GI-39, "Intermittent Incident"

.

>> INSPECTION END

Component Inspection

INFOID:0000000000964247

1.

CHECK PUSH-BUTTON IGNITION SWITCH 

Check push-button ignition switch.

Is the inspection result normal?

YES

>> .INSPECTION END

NO

>> Replace push-button ignition switch. Refer to 

PCS-122, "Removal and Installation"

.

Terminal

Push-button ignition switch 

position

Continuity

Push-button ignition switch

8

5

LOCK

Existed

6

ACC

7

ON

 

 

 

 

 

 

 

Content   ..  1001  1002  1003  1004   ..