|
|
AT-104 < SERVICE INFORMATION > DTC P0705 PARK/NEUTRAL POSITION SWITCH 2. Select “SELECTION FROM MENU” in “DATA MONITOR” mode for “TRANSMISSION” with CONSULT-III. 3. Check if correct selector lever position (N/P, R or D) is displayed as selector lever is moved into each posi- OK or NG OK >> GO TO 5. NG >> GO TO 2. 2. CHECK TCM POWER SUPPLY AND GROUND CIRCUIT Check TCM power supply and ground circuit. Refer to OK or NG OK >> GO TO 3. NG >> Repair or replace damaged parts. 3. DETECT MALFUNCTIONING ITEM Check A/T assembly harness connector pin terminals for damage or loose connection with harness connector. OK or NG OK >> GO TO 4. NG >> Repair or replace damaged parts. 4. CHECK SUB-HARNESS 1. Remove control valve with TCM. Refer to AT-215, "Control Valve with TCM and A/T Fluid Temperature . 2. Disconnect park/neutral position switch connector and TCM connector. 3. Check continuity between park/neutral position switch connector 4. If OK, check harness for short to ground and short to power. 5. Reinstall any part removed. OK or NG OK >> Replace the control valve with TCM. Refer to AT-215, "Control Valve with TCM and A/T Fluid Tem- . NG >> Replace open circuit or short to ground and short to power in harness or connectors. 5. CHECK DTC Perform AT-102, "DTC Confirmation Procedure" . OK or NG Item name Condition Display value SLCT LVR POSI Selector lever in “N” and “P” positions. N/P Selector lever in “R” position. R Selector lever in “D” position. D Item Connector Terminal Continuity Park/neutral position switch F505 1 Yes TCM connector F503 13 Park/neutral position switch F505 2 Yes TCM connector F503 11 Park/neutral position switch F505 3 Yes TCM connector F503 12 Park/neutral position switch F505 5 Yes TCM connector F503 14 SCIA5457E |