|
|
DIFFERENTIAL ASSEMBLY DLN-219 < UNIT DISASSEMBLY AND ASSEMBLY > [REAR FINAL DRIVE: R200] C E F G H I J K L M A B DLN N O P d. Confirm that the dimension of the side flange (1) installation 2WD : Adjustment INFOID:0000000005249240 TOTAL PRELOAD TORQUE Before inspection and adjustment, drain gear oil. 1. Secure final drive assembly onto an attachment [SST: KV38100800 (J-25604-01)]. 2. Remove side flanges. 3. Rotate drive pinion back and forth 2 to 3 times to check for unusual noise and rotation malfunction. 4. Rotate drive pinion at least 20 times to check for smooth opera- 5. Measure total preload with the preload gauge (A) [SST: NOTE: pinion bearing preload and side bearing preload. SIDE BEARING PRELOAD Before inspection and adjustment, drain gear oil. Remove rear cover. Refer to . Standard A : 326 – 328 mm (12.83 – 12.91 in) JSDIA0106ZZ Standard Total preload torque : Refer to JSDIA0031ZZ When the preload torque is large On pinion bearings: Replace the collapsible spacer. On side bearings: Use thinner side bearing adjusting washers by the same amount to When the preload is small On pinion bearings: Tighten the drive pinion lock nut. On side bearings: Use thicker side bearing adjusting washers by the same amount to |