Engine International HS 2.8L. Manual - part 5

 

  Index      International     Engine International HS 2.8L - service repair manual

 

Search            

 

 

 

 

 

 

 

 

 

Content   ..  3  4  5  6   ..

 

 

Engine International HS 2.8L. Manual - part 5

 

 

International HS 2.8L

2 4

Cooling System

INTERNATIONAL ENGINES

FAN PULLEY

Removal

1.

Remove fan, see FAN - Removal.

2.

Loosen pulley fixation bolts.

3.

Remove accessories belt, see
ACCESSORIES BELTS.

4.

Remove pulley.

Reinstallation

1.

Reinstall in the inverse order, tightening bolts
within 22 to 28 Nm.

WATER PUMP

Removal

1.

Drain cooling system.

2.

Remove radiator upper hose from the
thermostat.

3.

Loosen fixation bolts of the power steering
pump pulley.

4.

Loosen fixation bolts of the water pump
pulley.

5.

Remove belt tensor.

6.

Remove accessories belt, see
ACCESSORIES BELTS - Removal.

7.

Remove water pump pulley.

8.

Remove power steering pump pulley.

9.

Remove the 8 fixation bolts of the water
pump, marking the position of the 3 passing
bolts in the engine block.

10. Remove pump and gasket and clean the

contact surfaces.

2 5

International HS 2.8L

Cooling System

8120081 - 05/02 - Service Manual

INTERNATIONAL ENGINES

Reinstallation

1.

Reinstall water pump in the inverse order of
the removal, using a new gasket.

2.

Use two prisoners as guide to position the
new gasket, reinstall the assembly support in
the inverse order.

3.

Apply Loctite 242 and tighten the bolts with
the specified torque (See TIGHTENING
SPECIFICATIONS).

THERMOSTAT

Removal

1.

Partially drain cooling system, until the level
of the coolant water is below the thermostat
housing.

2.

Disconnect hose from thermostat housing.

3.

Disconnect electric connections of the water
temperature switch.

4.

Remove outlet elbow.

5.

Remove thermostat.

6.

Pay attention that the initial scale for the
thermostat operation evaluation test is
88 °C (190 °F). Install the thermostat in a
recipient with water. Heat the water up and
check the temperature in which the
thermostat begins to open. The thermostat
will be satisfactory if it opens between
86 and 90 °C (187 and 194 °F).

Reinstallation

1.

Put the thermostat with the breathe guide /
hole pin totally upwards (12 o-clock position).

2.

Install the outlet elbow and a new sealing
washer. Tighten bolts within 22 to 28 Nm.

3.

Invert the removal operations.

4.

Tighten bolts within 22 to 28 Nm.

5.

Check for coolant water leakages around all
the connections and gaskets.

International HS 2.8L

2 6

Cooling System

INTERNATIONAL ENGINES

Note:

The preliminary specified test in this manual for the thermostat evaluation helps the
diagnosis of a possible failure in the engine. Therefore, it is recommended to send the
thermostat to laboratorial analysis after the tests (if positive).

International HS 2.8L

Fuel System

2 8

INTERNATIONAL ENGINES

FUEL SYSTEM

PREVENTIVE MAINTENANCE

Fuel is an important factor to ensure the good
operation of the engine for a long time and without
failures.

The fuel must be clean, free of water and
impurities.

If the fuel used in the engine has to be stored, see
FUEL STORAGE.

During the engine operation, be aware to the fuel
indicator.

Fill the tank before the volume reaches the
minimum, because sedimented impurities in the
bottom of the tank can be suctioned, damaging
the filter.

Filling

1.

Clean filling inlet duct cover whenever
necessary.

2.

Every end of working day, fill the tank in order
to avoid the condensation of the air humidity.

Warning:

After tank filling, keep it very well
closed. Never improvise. If the
cap presents any problem,
replace it to a genuine spare
part.

Warning:

Bleed the system every time
the engine stops due of a fuel
lack.

Warning:

Do not smoke or get close any
type of exposed blame or
sparks while filling the tank,
because diesel fuel is very
inflammable.

 

 

 

 

 

 

 

Content   ..  3  4  5  6   ..